During the requirements gathering workshop for a new VMware Cloud Foundation (VCF)-based Private Cloud solution, the customer states that the solution must:
• Provide a single interface for monitoring all components of the solution.
• Minimize the effort required to maintain the solution to N-1 software versions.
When creating the design document, under which design quality should the architect classify these stated requirements?
During a requirements gathering workshop, several Business and Technical requirements were captured from the customer. Which requirement is classified as a Technical Requirement?
An architect is collaborating with a client to design a VMware Cloud Foundation (VCF) solution requiredfor a highly secure infrastructure project that must remain isolated from all other virtual infrastructures. The client has already acquired six high-density vSAN-ready nodes, and there is no budget to add additional nodes throughout the expected lifespan of this project. Assuming capacity is appropriately sized, which VCF architecture model and topology should the architect suggest?
An architect is planning resources for a new cluster that will be integrated into an existing VI Workload Domain. The cluster’s primary purpose is to support a mission-critical application with five resource-intensive virtual machines. Which design recommendation should the architect provide to prevent resource bottlenecks while meeting the N+1 availability requirement and keeping the overall investment cost minimal?
A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration. Which of the following should be a documented risk?
During a transformation project kick-off meeting, an architect highlights specific areas on which to focuswhile developing the new conceptual design. Which statement is the business requirement?
An architect is updating a design document in preparation for an expansion of their organization's existing VCF environment. Following the completion of a capacity assessment, a new cluster will be deployed to support the hosting of future application deployments. Due to restrictions on the availability of budget for the project, the hardware for the additional cluster has already been procured and there is no additional budget available for future procurements. What should the architect include within the design documentation based on this approach?
An architect decided to deploy an NSX Edge cluster using SDDC Manager. These Edges will be used by a Tier-0 Gateway configured with BGP to provide North-South connectivity in the Management Domain. Which statement justifies this design decision?
When determining the compute capacity for a VMware Cloud Foundation VI Workload Domain, which three elements should be considered when calculating usable resources? (Choose three.)
An architect is responsible for updating the design of a VMware Cloud Foundation solution for a pharmaceuticals customer to include the creation of a new cluster that will be used for a new research project. The applications that will be deployed as part of the new project will include a number of applications that are latency-sensitive. The customer has recently completed a right-sizing exercise using VMware Aria Operations that has resulted in a number of ESXi hosts becoming available for use. There is no additional budget for purchasing hardware. Each ESXi host is configured with:
2 CPU sockets (each with 10 cores)
512 GB RAM divided evenly between sockets
The architect has made the following design decisions with regard to the logical workload design:
The maximum supported number of vCPUs per virtual machine size will be 10.
The maximum supported amount of RAM (GB) per virtual machine will be 256.
What should the architect record as the justification for these decisions in the design document?
A VMware Cloud Foundation (VCF) platform has been commissioned, and lines of business are requesting approved virtual machine applications via the platform’s integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations. The platform has the following characteristics:
One Management Domain with a single cluster, supporting all management services with all network traffic handled by a single Distributed Virtual Switch (DVS).
A dedicated VI Workload Domain with a single cluster for all line of business applications.
A dedicated VI Workload Domain with a single cluster for Virtual Desktop Infrastructure (VDI).
Aria Operations is being used to monitor all clusters.
VI Workload Domains are using a shared NSX instance.
An application owner has asked for approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard, which is going to be verified by a third-party organization. To support the new service, which additional non-functional requirement should be added to the design?
The following requirements were identified in an architecture workshop for a virtual infrastructure design project.
REQ001: All virtual machines must meet the Recovery Time Objective (RTO) of twenty-four hours or less in a disaster recovery (DR) scenario.
Which two test cases will verify these requirements?
An architect is tasked with designing a new VMware Cloud Foundation environment and has identified the following customer-provided requirements:
REQ01: The application server must handle at least 30,000 transactions per second.
REQ02: The design must meet ISO 27001 information security standards.
REQ03: The storage network should maintain a minimum latency of 12 milliseconds before path failover.
REQ04: The staging environment should utilize a secondary third-party data center.
REQ05: Planned maintenance must be performed outside the hours of 8 AM to 8 PM GMT.
What are the two functional requirements? (Choose two.)
As part of the requirement gathering phase, an architect identified the following requirement for the newly deployed SDDC environment:
Reduce the network latency between two application virtual machines.
To meet the application owner's goal, which design decision should be included in the design?
A VMware Cloud Foundation multi-AZ (Availability Zone) design mandates that:
All availability zones must operate independently of each other.
The availability SLA must adhere to no less than 99.9%.
What would be the three design decisions that would help satisfy those requirements? (Choose three.)
An architect has come up with a list of design decisions after a workshop with the business stakeholders. Which design decision describes a logical design decision?
An architect has been asked to recommend a solution for a mission-critical application running on a single virtual machine to ensure consistent performance. The virtual machine operates within a vSphere cluster of four ESXi hosts, sharing resources with other production virtual machines. There is no additional capacity available. What should the architect recommend?
The following requirements were identified in an architecture workshop for a virtual infrastructure design project.
REQ001: All virtual machines must satisfy the Recovery Point Objective (RPO) of fifteen (15) minutes or less in a disaster recovery (DR) situation
REQ002: Service level availability must satisfy 99.999% measured yearly.
Which two test cases will validate these requirements?
A design requirement has been specified for a new VMware Cloud Foundation (VCF) instance. All managed workload resources must be lifecycle managed with the following criteria:
• Development resources must be automatically reclaimed after two weeks
• Production resources will be reviewed yearly for reclamation
• Resources identified for reclamation must allow time for review and possible extension
What capability will satisfy the requirements?
An Architect is responsible for designing a VMware Cloud Foundation (VCF)-based solution for a customer. During the discovery workshop, the following requirements were stated by the customer:
All applications/workloads designated as business critical have a Recovery Point Objective (RPO) of 1 business hour.
The infrastructure components of the VCF solution must have a Recovery Time Objective (RTO) of 4 business hours.
In the context provided, what does the RTO measure?
An architect is sizing the workloads that will run in a new VMware Cloud Foundation (VCF) Management Domain. The customer has a requirement to use Aria Operations to provide effective monitoring of the new VCF solution. What is the minimum Aria Operations Analytics node size requirement when AriaSuite Lifecycle is in VCF-aware mode?
A customer is designing a new VMware Cloud Foundation stretched cluster using L2 non-uniform connectivity, where due to a past incident an attacker was able to inject some false routes into their dynamic global routing table. What design decision can be taken to prevent this when configuring the Tier-0 gateway?
A VMware Cloud Foundation design incorporates the following technical requirements:
All management components must have their login sessions timeout after 2 minutes of inactivity.
Communication between management components should be limited to required ports only.
Modifications required by compliancy should not impact the management components’ functionality.
What would be the recommendation from a design perspective that would aid in achieving the above requirements?
Which statement defines the purpose of Technical Requirements?
During the requirements gathering workshop for a new VMware Cloud Foundation (VCF)-based Private Cloud solution, the customer states that the solution must:
• Provide sufficient capacity to migrate and run their existing workloads.
• Provide sufficient initial capacity to support a forecasted resource growth of 30% over the next 3 years.
When creating the design document, under which design quality should the architect classify these stated requirements?
The following design decisions were made relating to storage design:
• A storage policy that would support failure of a single fault domain being the server rack
• Two vSAN OSA disk groups per host each consisting of four 4TB Samsung SSD capacity drives
• Two vSAN OSA disk groups per host each consisting of a single 300GB Intel NVMe cache drive
• Encryption at rest capable disk drives
• Dual 10Gb or faster storage network adapters
Which two design decisions would an architect include within the physical design? (Choose two.)
As part of a VMware Cloud Foundation (VCF) design, an architect is responsible for planning for the migration of existing workloads using HCX to a new VCF environment. Which two prerequisites would the architect require to complete the objective? (Choose two.)