Question 1

Complete the sentence. ______ can be used to explain how generic solutions can be leveraged and specialized to meet the needs of an organization.

Options:

A.

The Architecture Repository

B.

The Solutions Landscape

C.

The TOGAF ADM

D.

The Enterprise Continuum

Question 2

What is the purpose of the Preliminary Phase?

Options:

A.

Developing an Enterprise Architecture Capability.

B.

Describing the target architecture.

C.

Defining the Enterprise Strategy.

D.

Identifying the stakeholders and their requirements.

Question 3

Complete the following sentence. In the ADM, documents which are under development and have not undergone any formal review and approval process are called______ Documents which have been reviewed and approved are called ______

Options:

A.

"draft"- "finalized"

B.

"draft" - "approved"

C.

"concept" - "deliverable"

D.

"Version 0.1" - "Version 1.0"

Question 4

What component of the Architecture Repository represents architecture requirements agreed with the Architecture Board?

Options:

A.

Reference Library

B.

Architecture Capability

C.

Architecture Requirements Repository

D.

Governance Log

Question 5

Which phase of the ADM has the purpose to develop an Enterprise Architecture Capability?

Options:

A.

Phase G

B.

Preliminary Phase

C.

Phase A

D.

Phase B

Question 6

When considering the scope of an architecture, what dimension considers to what level of detail the architecting effort should go?

Options:

A.

Project

B.

Breadth

C.

Depth

D.

Architecture Domains

Question 7

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1F-2G-3F-4F

B.

1E-2F-3E-4G

C.

1G-2E-3F-4E

D.

1F-2F-3E-4G

Question 8

Complete the sentence The TOGAF standard covers the development of four architecture domains. Business. Data, Technology and__________________.

Options:

A.

Segment

B.

Transition

C.

Capability

D.

Application

Question 9

In which phase of the ADM cycle do building blocks become implementation-specific?

Options:

A.

Phase B

B.

Phase C

C.

Phase D

D.

Phase E

Question 10

What is present in all phases within the ADM and should be identified, classified and mitigated before starting a transformation effort?

Options:

A.

Budgetary constraints

B.

Risk

C.

Schedule constraints

D.

Information gaps

Question 11

Which statement best describes the main purpose of the TOGAF Content Framework?

Options:

A.

To drive consistency in the outputs when following the ADM.

B.

To prevent gaps in the target architecture deliverable set.

C.

To store the artifacts identified in the Architecture Repository.

D.

To address IT system concerns relevant to an enterprise.

Question 12

Consider the following chart:

Which important concept for Enterprise Architecture Practitioners does it illustrate?

Options:

A.

Enterprise Architects must use Gantt charts to communicate with Stakeholders.

B.

An Enterprise Architecture must be developed in phases with a limited fixed duration.

C.

ADM phases must be run in a sequenced approach to produce the Architecture.

D.

ADM phases must be run simultaneously until the relevant information has been produced.

Question 13

Which section of the TOGAF template for Architecture Principles should highlight the business benefits of adhering to the principle?

Options:

A.

Rationale

B.

Name

C.

Implications

D.

Statement

Question 14

Consider the following statement.

According to the TOGAF standard, a governed approach of a particular deliverable will ensure adherence to the principles, standards, and requirements of the existing or developing architectures.

Which deliverable does this refer to?

Options:

A.

The Architecture Vision

B.

The Statement of Architecture Work

C.

An Architecture Contract

D.

The Architecture Definition Document

Question 15

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1F-2G-3G-4H

B.

1H-2F-3F-4G

C.

1F-2G-3H-4H

D.

1G-2H-3H-4F

Question 16

What are the three levels of the Architecture Landscape?

Options:

A.

Segment, Enterprise Strategic, and Capability Architectures

B.

Baseline, Transition, and To-Be Architectures

C.

Gaps, Plateaus, and Target Architectures

D.

Transitional, Complete, and Incremental Architectures

Question 17

Consider the following ADM phases objectives.

Objective

1-Determine whether an incremental approach is required, and if so identify Transition Architectures that will deliver continuous business value

2-Generate the initial complete version of the Architecture Roadmap, based upon the gap analysis and candidate Architecture Roadmap components from Phases B, C, and D

3-Finalize the Architecture Roadmap and the supporting Implementation and Migration Plan

4-Ensure that the business value and cost of work packages and Transition Architectures is understood by key stakeholders

Which phase does each objective match?

Options:

A.

1E-2F-3E-4F

B.

1G-2E-3F-4F

C.

1E-2E-3F-4F

D.

1F-2E-3F-4G

Question 18

What is an objective of the ADM Preliminary Phase?

Options:

A.

To develop a vision of the business value to be delivered by the proposed enterprise architecture

B.

To select and implement tools to support the Architecture Capability

C.

To obtain approval for the Statement of Architecture Work

D.

To create the initial version of the Architecture Roadmap

Question 19

Consider the following statement:

According to the TOGAF Standard a governed approach of a particular deliverable will ensure a system of continuous monitoring to check integrity changes decision-making and audit of all architecture-related activities

Which deliverable is being referred to?

Options:

A.

An Architecture Contract

B.

The Architecture Definition Document

C.

The Architecture Vision

D.

The Statement of Architecture Work

Question 20

Complete the sentence The purpose of the Preliminary Phase is to_____________.

Options:

A.

describe the target architecture

B.

define the enterprise strategy

C.

identify the stakeholders and their requirements

D.

architect an Enterprise Architecture Capability

Question 21

Which of the following best describes the TOGAF Architecture Development Method?

Options:

A.

A process for managing and controlling change at an enterprise-wide level

B.

A process for managing architecture requirements

C.

A method for developing and managing the lifecycle of an Enterprise Architecture

D.

A process for creating an Architecture Repository

Question 22

Consider the diagram showing a classification model for Architecture Landscapes.

What are the items labelled A, B and C?

Options:

A.

A-Strategy Architecture. B-Tactic Architecture, C-Operational Architecture

B.

A-Architecture Vision. B-Business Architecture. C-Architecture Development

C.

A-Corporate Capability. B-Portfolio Capability. C-Project Capability

D.

A-Enterprise Strategic Architecture. B-Segment Architecture. C-Capability Architecture

Question 23

What should be put in place through organization structures, roles, responsibilities, skills and processes to carry out architectural activity effectively?

Options:

A.

An EA Capability

B.

An Enterprise Architecture

C.

An EA framework

D.

An EA repository

Question 24

Please read this scenario prior to answering the question

You are the Lead Enterprise Architect at a major agribusiness company. The company's main

annual harvest is lentils, a highly valued food grown worldwide. The lentil parasite, broomrape,

has been an increasing concern for many years and is now becoming resistant to chemical

controls. In addition, changes in climate favor the propagation and growth of the parasite. As a

result, the parasite cannot realistically be exterminated, and it has become pandemic, with lentil

yields falling globally.

The CEO appreciates the seriousness of the situation and has set out a change in direction

that is effectively a new business for the company. There are opportunities for new products,

and new markets. The company will use the fields for another harvest and will cease to process

third-party lentils. Thus, the target market will change, and the end-products will be different

and more varied. This is a major decision and the CEO has stated a desire to repurpose rather

than replace so as to manage the risks and limit the costs.

The company has a mature Enterprise Architecture practice based in its headquarters and uses

the TOGAF standard as the method and guiding framework. The practice has an established

Architecture Capability, and uses iteration for architecture development. The CIO is the sponsor

of the activity.

The CIO has assigned the Enterprise Architecture team to this activity. At this stage there is no

shared vision, or requirements.

Refer to the scenario

You have been asked to propose the best approach for architecture development to realize the

CEO's change in direction for the company.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You propose that the team focus on architecture definition, with emphasis on definingthe change parameters to support this new business strategy that the CEO hasidentified. Once understood, the team will be in the best position to identify therequirements, drivers, issues, and constraints for the change. You would ensure that thearchitecture development addresses non-functional requirements to assure that thetarget architecture is robust an

B.

You propose that this engagement define the baseline Technology Architecture first inorder to assess the current infrastructure capacity and capability for the company. Thenthe focus should be on transition planning and incremental architecture deployment.This will identify requirements to ensure that the projects are sequenced in an optimalfashion so as to realize the change.

C.

You propose that the priority is to understand and bring structure to the definition of thechange. The team should focus iteration cycles on a baseline first approach toarchitecture development, and then transition planning. This will identify what needs tochange in order to transition from the baseline to the target, and can be used to work outin detail what the shared vision is for the change.

D.

You propose that the team focus its iteration cycles on architecture development bygoing through the architecture definition phases (B-D) with a baseline first approach.This will support the change in direction as stated by the CEO. It will ensure that thechange can be defined in a structured manner and address the requirements needed torealize the change.

Question 25

Full Scenario

You are employed as an Enterprise Architect within the Enterprise Architecture (EA) team at a clinical research and health technologies company. The company has multiple divisions. Your team works within the healthcare division.

The healthcare division is always creating new products and needs to show the effectiveness and safety of the products. This happens in a set of clinical trials that satisfy the legal requirements of the relevant health authorities. The clinical trials are undertaken by the division’s research laboratories at multiple facilities worldwide. At any time, there are many clinical trials happening. In addition to internal research and development activities, the healthcare division is also involved in publicly funded research projects with industrial and academic partners.

Your team is working on an architecture project to develop a secure system that will allow the healthcare researchers to share information more easily about their clinical trials. It will make working together easier across the organization. This system will also allow secured collaboration with external partners.

The EA team uses the TOGAF Architecture Development Method with adaptations required to support healthcare production methods and laboratory procedures. Due to the highly sensitive nature of the information that is managed, special care has been taken to ensure that each architecture domain considers the privacy and safety concerns.

The EA team has been instructed to minimize disruptions to the trials and to gradually introduce the new system.

The company has an established EA practice and has adopted the TOGAF standard for use in its architecture work. The EA practice is federated, which allows some interoperability and information sharing between the divisions yet permits partially independent activity. The Vice President of the healthcare division is the sponsor of the Enterprise Architecture activity for your EA team.

Question:

As part of introducing the new system, how would you go about breaking down the project into work packages?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

Identify Solution Building Blocks needing development or procurement, eliminate duplicates, group with CRUD matrices, rank work packages, select cost-effective options, and schedule rollouts in Transition Architectures.

B.

Create an Implementation Factor Catalog to indicate actions and constraints. Draw up a matrix with architecture domains and gaps. For each gap, classify solutions as new development, purchased, or existing product. Group similar activities into work packages, identify dependencies, and regroup them into Capability Increments scheduled across Transition Architectures.

C.

Use a Consolidated Gaps, Solutions, and Dependencies Matrix as a planning tool; classify solutions, group similar ones, and regroup into Capability Increments documented in an Architecture Definition Increments Table.

D.

Use Solution Building Blocks from a Consolidated Gaps, Solutions, and Dependencies Matrix and group into work packages, sequence them, and document rollout using a Transition Architecture State Evolution Table.

Question 26

Please read this scenario prior to answering the question

Your role is consultant to the Lead Architect within a multinational company that manufactures electronic components. The company has several manufacturing divisions located worldwide and a complex supply chain. After a recent study, senior management have stated a concern about business efficiency considering the company's multiple data centers and duplication of applications.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF architecture development method in its EA practice. In addition to the EA program, the company has several management frameworks in use, including business planning, project/portfolio management, and operations management. The EA program is sponsored by the CIO.

A strategic architecture has been defined to improve the ability to meet customer demand and improve management of the supply chain. The strategic architecture includes the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions' production facilities.

Each division has completed the Architecture Definition documentation to meet its own specific manufacturing requirements. The enterprise architects have defined a set of work packages that address the gaps identified. They have identified the value produced, effort required, and dependencies between work packages to reach a farget architecture that would integrate a new ERP environment into the company.

Because of the risks posed by change from the current environment, the architects have recommended that a phased approach occurs to implement the target architecture with several transition states. The overall implementation process is estimated to take several years.

Refer to the scenario

You have been asked what the next steps are for the migration planning.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then you would identify changes to performance requirements and update those in th

B.

You place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would identify the development resources to undertake the projects. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architectur

C.

You estimate the business value for each project by applying the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm and plan a series of Transition Architecture phases using an Architecture Definition Increment

D.

You assess how the Implementation and Migration plan impacts the other frameworks in use in the organization. Minimally, you ensure that the plan is coordinated with the business planning, project/portfolio management and operations management frameworks. You would then assign a business value to each work package, considering available resources and strategic fit. You then use the work packages to identify projects that will be in the Impl

Question 27

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at a large government agency with multiple divisions. The agency has a well-established EA practice and follows the TOGAF standard as its method for architecture development. The government has mandated that the agency prepare for an "AI-first" world.

The agency wants to determine the impact and role of AI in its future services. The CIO has approved a Request for Architecture Work to explore the use of AI in services. Some leaders are concerned about reliance on AI, security, and employees’ need to acquire new skills.

The EA team leader seeks suggestions on managing the risks associated with a new architecture for the AI-first project. Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Conduct an analysis of stakeholders, documenting their concerns and recording them in the Architecture Vision document. Risks should be recorded in the Architecture Requirements Specification and reviewed regularly.

B.

Identify key stakeholders and develop a Communication Plan that addresses their needs. Ensure the architecture addresses risk management and summarizes features of the architecture.

C.

Separate stakeholders into groups and categorize them. Develop models for each group and verify that their concerns are addressed in Phase G, Implementation Governance.

D.

Create an organization map to show the links between different agency parts. Hold a meeting to teach stakeholders to interpret the models. Manage risks as part of Security Architecture development.

Question 28

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect at a company. The company manages

large-scale farming operations with food production, processing, and distribution. The

goal of the company is to maximize profit while satisfying the needs of consumers for

its products. Its customers demand food that is produced sustainably, safely, and

transparently, while reducing environmental impact.

The business is highly mechanized, and this mechanization has brought about a

decrease in the number of workers needed, together with a focus on agricultural

engineering to improve the efficiency of its farms, its processing facilities, and the

overall enterprise. As part of this, the company has established an Enterprise

Architecture (EA) practice based on the TOGAF standard, using it as the method and

guiding framework. The Chief Information Officer (CIO) is the sponsor of EA practice.

The practice has adopted an iterative approach for its architecture development. This

has enabled the decision makers to have valuable insights into the different aspects

of the business.

In recent years there have been a series of bad harvests, and a major reduction in

yields of the main crop produced by the company. This combined with an increase in

costs for energy, feed, fuel, and fertilizer, had led to a significant decrease in profits.

The rising costs and lower profits mean that the company is unable to take as much

planned action on climate measures as it would like, such as reducing its carbon

footprint. The Chief Executive Officer (CEO) has stated that big changes are needed

to improve yields and profitability.

The outline strategy for change, includes new products, and new markets. The

company will switch to a mix of crops rather than depend on a main crop and will

allow use of its processing facilities by third parties. This is a major decision, and the

CEO has stated a desire to repurpose and reuse rather than replace so as to manage

the risks and limit the costs.

The CIO has assigned the EA team to manage this project. The CIO has stated that

although the overall objective is known, the EA team are expected to define the

scope, a shared vision, and the requirements.

Refer to the scenario

You have been asked to recommend the best approach for architecture development

to realize the CEO's change in direction for the company.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

The team should start on architecture definition and operate multiple ADM

phases concurrently to support this change in direction. Once understood, the

team will identify the requirements, drivers, issues, and constraints for the

change. You would include non-functional requirements in the architecture

development to make sure that the target architecture meets it compliance and

regulatory requirements.

B.

The team first needs to understand the problem and define the structure of the

change. It should start iteration cycles on a baseline first approach to

architecture development, and then transition planning. This will identify the

change needed to transition from the baseline to the target and can be used to

work out in detail what the agreed vision is for the change.

C.

The team should start its iteration cycles of architecture development by going

through the architecture definition phases (B-D) with a baseline first approach.

This will support the change in direction as stated by the CEO. It will ensure

that the change can be defined in a structured manner and address the

requirements needed to realize the change.

D.

The team should start by defining the baseline Technology Architecture in order

to assess the current infrastructure capacity and capability for the company.

Then the focus should be on transition planning and incremental architecture

deployment. This will identify requirements to ensure that the projects are

sequenced in an optimal way to realize the change.

Question 29

Please read this scenario prior to answering the question

You are the Lead Enterprise Architect at a major agribusiness company. The company's main harvest is lentils, a highly valued food grown worldwide. The lentil parasite, broomrape, has been an increasing concern for many years and is now becoming resistant to chemical controls. In addition, changes in climate favor the propagation and growth of the parasite. As a result, the parasite cannot realistically be exterminated, and it has become pandemic, with lentil yields falling globally.

In response to the situation, the CEO has decided that the lentil fields will be used for another harvest. The company will also cease to process third-party lentils and will repurpose its processing plants. Thus, the target market will change, and the end-products will be different and more varied.

The company has recently established an Enterprise Architecture practice based on the TOGAF standard as method and guiding framework. The CIO is the sponsor of the activity. A formal request for architecture change has been approved. At this stage there is no fixed scope, shared vision, or objectives.

Refer to the scenario

You have been asked to propose the best approach for architecture development to realize the CEO's change in direction for the company.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You propose that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability for the company. Then the focus should be on transition planning and incremental architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the change.

B.

You propose that the team uses the architecture definition document and focus on architecture development starting simultaneously phases B, C and D. This is because the CEO has identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the change.

C.

You propose that the team focus on architecture definition including development of business models, with emphasis on defining the change parameters to support this new business strategy that the CEO has identified. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for the change.

D.

You propose that the priority is to produce a new Request for Architecture Work leading to development of a new Architecture Vision. The trade-off method should be applied to identify and select an architecture satisfying the stakeholders. For an efficient change the EA team should be aligned with the organization's planning, budgeting, operational, and change processes.

Question 30

Please read this scenario prior to answering the question

You are working as an Enterprise Architect within a healthcare and life science company. The company is a

leading player in its industry, dedicated to transforming healthcare with new ideas and advancements. The

company has multiple divisions that cover different aspects of the business.

The company's Enterprise Architecture (EA) department has been operating for several years and has

mature, well-developed architecture governance and development processes following the TOGAF

Standard. In addition to the EA program, the company has a number of management frameworks in use.

The Architecture Board includes representatives from each division of the company.

Many of the company's rivals have begun utilizing Artificial Intelligence (Al) in their operations, and the

indications are that this will be transformative for healthcare delivery. This is something the EA department

has been interested in for a while, and they had recently submitted an architecture Change Request which

was approved. As a result, the CIO has approved a Request for Architecture Work to investigate the

implementation of Al in the company.

Areas for evaluation include:

How can staff use Al daily in their current role?

How Al can enhance access to care for patients, and how to make that experience seamless?

How Al can offer new workplace platforms and tools to increase efficiency?

Some of the top managers are worried about a change in the way of working, and if it will achieve the goals.

Many are not confident that the company's risk management processes are adequate for a company-wide

integration of generative Al. There are also questions from staff about whether enough specific guidelines

and polices have been put in place for responsible use of Al.

The Chief Information Officer (CIO) is the sponsor of the Enterprise Architecture program. The CIO has

actively encouraged architecting with agility within the EA department as her preferred approach for projects.

The CIO wants to know how to address these concerns and reduce risks.

Refer to the scenario

You have been tasked with starting the architecture development. How do you begin?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You recommend that an analysis of the stakeholders is undertaken. This will allow the architects todefine groups of partners (the stakeholders) who have common concerns and include developmentof a Stakeholder Map. The concerns and relevant views should then be defined for each group andrecorded in the Architecture Vision document. To mitigate risk, you include a requirement that therebe progressive development of the target architecture to

B.

You recommend that a Communications Plan be created to address the key stakeholders, that is themost powerful and influential partners. This plan should include a report that summarizes the keyfeatures of the architecture with respect to each location and reflects the stakeholders' requirements.You will check with each key stakeholder that their concerns are being addressed. Risk mitigationshould be explicitly addressed as a component of th

C.

You recommend that models be created for the Draft Business, Data, Application, and TechnologyArchitectures. These can be used to ensure that the system will be compliant with the localregulations for each division. Together with the problem description, and requirements, this ensuresthat all the necessary data and detail is addressed. A formal review should be held with thestakeholders to verify that their concerns have been properly addre

D.

You recommend creation of a set of business models that can be applied uniformly across all Al-related architecture projects. These should be developed in the portable format to ensure maximumportability across the many tools used in the firm. Each architecture should then be defined based onthis fixed set of models. All concerned parties can then examine the models to ensure that theirneeds have been addressed.

Question 31

Scenario

Your role is that of an Enterprise Architect, reporting to the Chief Enterprise Architect, at a technology company.

The company uses the TOGAF standard as the method and guiding framework for its Enterprise Architecture (EA) practice. The Chief Technology Officer (CTO) is the sponsor of the activity. The EA practice uses an iterative approach for its architecture development. This has enabled the decision-makers to gain valuable insights into the different aspects of the business.

The nature of the business is such that the data and the information stored on the company systems is the company’s major asset and is highly confidential. The company employees travel a lot for work and need to communicate over public infrastructure. They use message encryption, secure internet connections using Virtual Private Networks (VPNs), and other standard security measures. The company has provided computer security awareness training for all its staff. However, despite good education and system security, there is still a need to rely on third-party suppliers for infrastructure and software.

The Chief Security Officer (CSO) has noted an increase in ransomware (malicious software used in ransom demands) attacks on companies with a similar profile. The CSO recognizes that no matter how much is spent on education and support, the company could be a victim of a significant attack that could completely lock them out of their important data.

A risk assessment has been completed, and the company has looked for cyber insurance that covers ransomware. The price for this insurance is very high. The CTO recently saw a survey that said 1 out of 4 businesses that paid ransoms could not get their data back, and almost thesame number were able to recover the data without paying. The CTO has decided not to get cyber insurance to cover ransom payment.

You have been asked to describe the steps you would take to strengthen the current architecture to improve data protection.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would ensure that the company has in place up-to-date processes for managing change to the current Enterprise Architecture. Based on the scope of the concerns raised, you recommend that this be managed at the infrastructure level. Changes should be made to the baseline description of the Technology Architecture. The changes should be approved by the Architecture Board and implemented by change management techniques.

B.

You would request an Architecture Compliance Review with the scope to examine the company’s ability to respond to ransomware attacks. You would identify the departments involved and have them nominate representatives. You would then tailor checklists to address the requirement for increased resilience. You would circulate to the nominated representatives for them to complete. You would then review the completed checklists, identifying and r

C.

You would monitor for technology updates from your existing suppliers that could enhance the company’s capabilities to detect, react, and recover from an IT security incident. You would prepare and run a disaster recovery planning exercise for a ransomware attack and analyze the performance of the current Enterprise Architecture. Using the findings, you would prepare a gap analysis of the current Enterprise Architecture. You would prepare c

D.

You would assess business continuity requirements and analyze the current Enterprise Architecture for gaps. You would recommend changes to address the situation and create a change request. You would engage the Architecture Board to assess and approve the change request. Once approved, you would create a new Request for Architecture Work to begin an ADM cycle to implement the changes.

Question 32

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect in a multinational automotive manufacturer.

The company has a corporate strategy that focuses on electrification of its portfolio, and it has invested

heavily in a new shared car platform to use across all its brands. The company has four manufacturing

facilities, one in North America, two in Europe, and one in Asia.

A challenge that the company is facing is to scale up the number of vehicles coming off the production line to meet customer demand, while maintaining quality. There are significant supply chain shortages for electronic components, which are impacting production. In response to this the company has taken on new suppliers and has also taken design and production of the battery pack in-house.

The company has a mature Enterprise Architecture practice. The TOGAF standard is used for developing

the process and systems used to design, manufacture, and test the battery pack. The Chief Information

Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

As part of putting the new battery pack into production, adjustments to the assembly processes need to be made. A pilot project has been completed at a single location. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for implementation and migration at each plant.

Draft Architecture Contracts have been developed that detail the work needed to implement and deploy the new processes for each location. The company mixes internal teams with a few third-party contractors at the locations. The Chief Engineer has expressed concern that the deployment will not be consistent and of acceptable quality.

Refer to the scenario

The Lead Enterprise Architect has asked you to review the draft Architecture Contracts and recommend the best approach to address the Chief Engineer's concern.

Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

For changes requested by an internal team, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. For contracts issued to third-party contractors, you recommend that it is a fully enforceable legal contract. You recommend thatthe Architecture Board reviews all deviations from the Architecture Contract and considers whether togrant a dispensation to allow the implementation organization

B.

For changes undertaken by internal teams, you recommend a memorandum of understandingbetween the Architecture Board and the implementation organization. If a contract is issued to acontractor, you recommend that it is a fully enforceable legal contract. If a deviation from theArchitecture Contract is found, you recommend that the Architecture Board grant a dispensation toallow the implementation organization to customize the process to meet

C.

You review the contracts ensuring that they address project objectives, effectiveness metrics,acceptance criteria, and risk management. Third-party contracts must be legally enforceable. Yourecommend a schedule of compliance reviews at key points in the implementation process. Yourecommend that the Architecture Board reviews all deviations from the Architecture Contract andconsiders whether to grant a dispensation to allow the process to be

D.

You recommend that the Architecture Contracts be used to manage the architecture governanceprocesses across the locations. You recommend deployment of monitoring tools to assess theperformance of each completed battery pack at each location and develop change requirements ifnecessary. If a deviation from the contract is detected, the Architecture Board should allow theArchitecture Contract to be modified meet the local needs. In such cases

Question 33

Please read this scenario prior to answering the question

You are the Chief Enterprise Architect at a large food service company specializing in sales to trade and

wholesale, for example, restaurants and other food retailers.

One of your company's competitors has launched a revolutionary product range and is running a very

aggressive marketing campaign. Your company's resellers are successively announcing that they are not

interested in your company's products and will sell your competitor's.

The CEO has stated there must be significant change to address the situation. He has made it clear that

new markets must be found for the company's products, and that the business needs to pivot, and address the retail market as well as the existing wholesale market.

A consideration is the company's ability and willingness to change its business model, and if it is a temporary or permanent change. An additional risk factor is one of culture. The company has been used to a stable business with a reasonably well known and settled client base - all with its own local understandings and practices.

The CEO is the sponsor of the EA program within the company. You have been engaged with the sales,

logistics, production, and marketing teams, enabling the architecture activity to start. An Architecture Vision, Architecture Principles, and Requirements have all been agreed. As you move forward to develop a possible Target Architecture you have identified that some of the key stakeholders' preferences are incompatible. The incompatibilities are focused primarily on time-to-market, cost savings, and the need to bring out a fully featured product range, but there are additional factors.

Refer to the scenario

You have been asked how you will address the incompatibilities between key stakeholder preferences.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You would seek to understand value preferences and priorities of the stakeholders. You woulddevelop alternative Target Architectures, highlighting the gaps between current state and thealternatives. You would consider combining features from one or more alternatives in collaborationwith the stakeholders. A formal stakeholder review should then be held to decidewhich alternative isfit for purpose and should be moved forward with. You will th

B.

You recommend that since the CEO has stated that the company must pivot, it is better tocompromise on a full product range rather than time-to-market. You would develop just enough of theTarget Architecture to demonstrate fitness of the proposed approach. You would limit the descriptionto just where there is a gap between the current baseline. You would seek approval by thestakeholders to move forward with developing the Target Architecture

C.

You would use the Architecture Vision, Principles, and Requirements to define a set of criteria foralternatives and create a set of architecture views to illustrate the impact of the alternative TargetArchitectures. You would identify the impact on planned projects. You would understand the strengthsand weaknesses of the alternatives. You would conduct a formal stakeholder review to decide whichalternative to move forward with. You will det

D.

You would review the Stakeholder Map and ensure that you have addressed and represented theconcerns of all department heads. You will involve them in resolving the incompatibilities. TheCommunications Plan should include a report that summarizes the key features of the architecturewith and how incompatibilities were resolved to reflects the stakeholders' requirements. You willcheck with each key stakeholder they are satisfied with how the i

Question 34

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect consultant within a manufacturing company. The company has multiple business units located worldwide, including retail, manufacturing, pharmaceuticals, and technology.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF standard for its architecture development method. The EA practice is engaged throughout all the business units, with governance provided by multiple Architecture Boards with responsibility for a business line. In addition to the EA program, the company uses a number of management frameworks, including business planning, project/portfolio management, and operations management. The EA program is sponsored by the Chief Information Officer (CIO).

After a recent study, senior management are concerned about the impact of the company's multiple data centers and duplication of applications on the business efficiency. To address the concern, a strategic architecture has been defined; it will help improve the ability to meet customer demand and improve the efficiency of operations. The strategic architecture involves the consolidation of multiple applications programs that are currently used in different business units and putting them all onto a cloud-based solution instead.

Each business unit has completed the Architecture Definition documentation to meet its own specific operational requirements. The Enterprise Architects have analyzed the corporate changes and implementation constraints. A consolidated gap analysis has been completed. Based on its results, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the cloud-based solution. The architects have completed the Business Transformation Readiness Assessment. Based on all these factors they have produced a risk assessment. They have also completed the draft Implementation and Migration Plan, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Due to the risks of changing from the current environment, the decision has been taken that a gradual approach is needed to implement the target architectures. It will likely take a few years to complete the whole implementation process.

Refer to the scenario

You have been asked to decide on the next steps for the migration planning.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You update the Architecture Definition Document, which includes setting project objectives and

documenting the final requirements. This will ensure that the architecture remains relevant and

responsive to the needs of the enterprise. You then produce an Implementation Governance Model to

manage the lessons learned prior to finalizing the Implementation and Migration plan. You

recommend that lessons learned be quickly

B.

You estimate the business value for each project by applying the Business Value Assessment

Technique. The assessment should focus on return on investment and performance evaluation

criteria used to monitor the progress of the architecture transformation. You confirm and plan a series

of Transition Architecture phases using an Architecture Definition Increments Table. You then

document the lessons learned and generate

C.

You need to determine how the Implementation and Migration plan fits with the other frameworks

being used in the organization. You coordinate the planning with the business planning,

project/portfolio management and operations management frameworks. You assign a business value

to each project, considering the available resources and how well they align with the strategy. You

then update the architecture roadmap and t

D.

You conduct a Compliance Assessment to ensure that the architecture is being implemented

according to the contract. The Compliance Assessment verifies that the implementation team is using

the proper development methodology. It should also include deployment of monitoring tools. If the

monitoring tools show that performance targets are not being met, then the performance

requirements should be changed and the Impleme

Question 35

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect at a leading global technology enterprise

specializing in digital infrastructure, cloud computing, and data-centric innovation. The

company provides a vast ecosystem of platforms that serve billions of users across

the globe. These platforms span online marketplaces, advanced advertising networks,

Al-driven services, productivity tools, and digital entertainment experiences.

The senior leadership within the company is worried about the company's ability to

address all the opportunities around artificial intelligence (Al). They feel that the

business is at risk of falling behind its competitors, and that significant changes are

necessary for the business to remain competitive. Most senior leaders feel that the

operations need to be more efficient, and the organization needs to change to achieve

its future goals.

The company has an established Enterprise Architecture (EA) program based on the

TOGAF standard, sponsored jointly by the Chief Information Officer (CIO) and senior

executives. In your role as an Enterprise Architect within the EA team, you work

closely with the business stakeholders in the company as well as the sponsors.

The CEO has decided that reorganizing its subsidiaries around artificial intelligence

and machine learning will improve the way the company creates and delivers value.

The sponsors have approved a project for the reorganization which is being led by the

EA team.

The EA team have developed a strategic architecture which has been approved by

the sponsors. It includes an Architecture Vision, and high-level definitions of the

domain architectures. This sets out a plan over a multi-year period and covers three

distinct transformations to implement the reorganization.

The sponsors have read reports that the majority of transformation projects dealing

with digital and artificial intelligence are failing. They have made it clear that prior to

the approval of the detailed Implementation and Migration plan, the EA team needs to

address the risks associated with the reorganization. They want assurance that the

reorganization will succeed and deliver the promised increases in value for the

business.

Refer to the scenario

The EA team leader has asked how you would address the request from the

sponsors.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Before preparing the detailed Implementation and Migration plan, you would

review and consolidate the gap analysis results from Phases B to D. This

enables you to evaluate the implications related to potential solutions and inter-

dependencies. It is used to identify the transformations required to achieve the

proposed Target Architecture. You then assess the readiness of the

organization to undergo change and

B.

You would apply an analysis and assessment to evaluate the potential risks

with the proposed new architecture. This includes the development of a matrix

showing the organizational requirements. The degree of change should then

be aligned with the corporate operating model to ensure risks are mitigated

and minimized. The risk mitigations can then be included within each of the

target Transition Architectures. Yo

C.

You would assess how ready the organization is to change. This includes

identification and classification of the risks associated with the transformations,

together with an approach to mitigate the risks. This includes identifying

dependencies between the set of changes, including gaps and work packages.

It also identifies improvement actions to be worked into the Implementation and

Migration Plan. The business

D.

You would bring together information about potential approaches and produce

several alternative target transition architectures. You would then investigate

the different architecture alternatives and discuss these with stakeholders

using the Architecture Alternatives and Trade-offs technique. Once the target

architecture has been selected, it should be analyzed using a state evolution

table to determine the Tra

Question 36

Full Scenario

You are employed as an Enterprise Architect in an Enterprise Architecture (EA) team at a food production and distribution company. The main goal of the company is to increase profit while meeting the needs of consumers for its products. Its customers want food that is produced sustainably, safely, and transparently, while reducing environmental impact.

The company has an Enterprise Architecture practice based on the TOGAF standard, using it as the method and guiding framework. The Chief Information Officer (CIO) is the sponsor of EA practice.

The business is a highly mechanized agricultural operation where business capabilities, including planting, harvesting, processing, packaging, and distribution, rely heavily on technology and machinery. The use of EA has enabled the decision makers to have valuable insights into the different aspects of the business.

The warmer climate has led to less successful farming, and the company is growing fewer crops than before. Also, prices for energy, feed, fuel, and fertilizer have gone up. This has caused a big drop in earnings. Due to the rising costs and lower profits, the company has been unable to do as much to help the environment. It especially has struggled to reduce its carbon emissions.

In response to the situation, the Chief Executive Officer (CEO) has decided that big changes are needed, that will lead both to improved crop production and profitability. They must look to all aspects of the business. This includes looking at the mix of crops to mitigate for the change in climate. The company will also cease to process its own crops and will sell off its processing facilities. Thus, the target market will change, and the end-products will be different and more varied. A formal request for architecture change has been approved. At this stage there is no fixed scope, shared vision, or objectives.

Question:

What is the best approach for architecture development to realize the CEO’s change in direction for the company?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

The team should use the Architecture Definition Document and work on architecture development starting simultaneously phases B, C and D. This is because the CEO has identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the change.

B.

The team should define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability for the company. Next, the team should concentrate on transition planning and incremental architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion to realize the change.

C.

The team should produce a new Request for Architecture Work leading to development of a new Architecture Vision. The trade-off method should be applied to identify and select an architecture satisfying the stakeholders. For an efficient change the EA team should be aligned with the organization’s planning, budgeting, operational, and change processes.

D.

The team should work on architecture definition including development of business models, with emphasis on defining the change parameters to support this new business strategy that the CEO has identified. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for the change.

Question 37

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect to an international supplier of

engineering services and automated manufacturing systems. It has three manufacturing plants

where it assembles both standard and customized products for industrial production

automation. Each of these plants has been operating its own planning and production

scheduling systems, as well as applications and control systems that drive the automated

production line.

The Enterprise Architecture department has been operating for several years and has mature,

well-developed architecture governance and development processes that are based on the

TOGAF Standard. The CIO sponsors the Enterprise Architecture.

During a recent management meeting, a senior Vice-President highlighted an interview where

a competitor company's CIO is reported as saying that their production efficiency had been

improved by replacing multiple planning and scheduling systems with a common Enterprise

Resource Planning (ERP) system located in a central data center. Some discussion followed,

with the CIO responding that the situations are not comparable, and the current architecture is

already optimized.

In response, the Architecture Board approved a Request for Architecture Work covering the

investigations to determine if such an architecture transformation would lead to improvements

in efficiency. You have been assigned to support the architecture team working on this project.

A well-known concern of the plant managers is about the security and reliability of driving their

planning and production scheduling from a remote centralized system. Any chosen system

would also need to support the current supply chain network consisting of local partners at

each of the plants.

Refer to the scenario

You have been asked to explain how you will initiate the architecture project.

Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

You would research vendor literature and conduct a series of briefings with vendorsthat are on the current approved supplier list. Based on the findings from theresearch, you would define a preliminary Architecture Vision including summaryviews, high-level requirements, and high-level definitions of the baseline and targetenvironments from a business, information systems, and technology perspective. Youwould then use that to build consensus

B.

You would conduct a pilot project that will enable vendors to demonstrate potentialoff-the-shelf solutions that address the concerns of the stakeholders. Running a pilotproject will save time and money later in the process. Based on the findings of thatpilot project, a complete set of requirements can then be developed that will drive theevolution of the architecture. Once the requirements are completed, a formalstakeholder review should be

C.

You would hold a series of interviews at each of the manufacturing plants using thebusiness scenarios technique. This will allow you to understand the systems andintegrations with local partners. You would use stakeholder analysis to identify keyplayers in the engagement, and to understand their concerns. You will then identifyand document the key high-level stakeholder requirements for the architecture. Youwill then generate high level def

D.

You would develop baseline and target Architectures for each of the manufacturingplants, ensuring that the views corresponding to selected viewpoints address keyconcerns of the stakeholders. A business case, together with performance metricsand measures should be defined to ensure the architecture meets the businessneeds. A consolidated gap analysis between the architectures will then validate theapproach and determine the capability increm

Question 38

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect at a multinational energy company. The company is committed to reducing its emissions. To achieve this, the company is increasing production of renewable energy and adopting eco-friendly practices.

The company has an Enterprise Architecture (RA) practice and follows the TOGAF standard for its EA framework. The EA team manages all the major projects in the company. The EA team reports to the Chief Technical Officer (CTO), who is the sponsor of the EA program. The Architecture Board is made up of senior leaders from all parts of the company.

The company is starting to invest in developing various kinds of renewable energy projects, including solar, and wind. A large part of the growth in its renewable energy portfolio has come from buying other companies. The company is keen on acquiring small startups and mid-size companies to leverage their technical innovations. This way, the company aims to outperform its competitors, scale rapidly, and establish a presence in new markets.

The existing business and the newly acquired companies are not working well together, which increasingly causes problems. In response, a strategic plan was created and approved. The plan aims to make the merged companies work more effectively together. This will save money by sharing their common assets, including fixed capital assets, research and development facilities, and resources.

The EA team have been asked to oversee the transformation to carry out the strategic plan. A Request for Architecture Work for the project has created and has been approved. The goal is to strengthen the company's position in the market and reduce costs by taking advantage of economies of scale. The Chief Executive Officer (CEO) has stated that to stay competitive and relevant, the company must transform or entirely reinvent its business model.

Refer to the Scenario

What needs to be done to make sure that the company succeeds with the changes and how should risks be managed?

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

The EA team should document the risks associated with the transformation in an Implementation Factor Catalog. This will be used as a record of important decisions during implementation and deployment for the transformation effort. The catalog should list all the factors to consider, their descriptions, and any limitations to consider. These factors can then be used to help evaluate the risks, which can be documented in the Implementation an

B.

The EA team should use the Business Scenarios technique to describe the business problem,

identify the stakeholders' concerns and achieve consensus on the requirements. Once the

requirements have been identified, they can be evaluated in terms of their risks. The risks should be assessed in terms of how they can be avoided, transferred, or reduced. Risks that cannot be

resolved should be identified as residual risks and ho

C.

The EA team should develop a set of Business Architecture views to demonstrate how stakeholder concerns are being addressed. These views can also be used to identify the factors that will impact the transformation. For each factor identified, there should be a structured assessment of the current state of each factor against a maturity model. This information can then be used to determine the potential risks associated with the transformati

D.

The EA team needs to identify obstacles that could hinder the project. This should include identifying the factors that will impact the transformation, and determining the readiness level for each factor based on a scale that will help the team to understand the urgency, readiness, and degree of difficulty to fix. These factors can be used to evaluate the initial risks of the change, areas of risk that need attention, and areas where you ne

Question 39

Scenario:

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at an electric vehicle manufacturer. The company produces electric cars and battery systems. The goal of the company is to build the best technology and software platform for electric vehicles.

The company has decided to introduce a major change to its vehicle design over a five-year period. This will be a cross-functional effort between hardware and software teams, delivering significant new features in the vehicles they manufacture. It is planned to be developed in phases.

An architecture to support strategy has been completed with a roadmap for a set of projects.

The EA team has inherited the architecture for the hardware and software automotive platform used by current vehicles, some of which can be carried over to the new vehicle design. The EA team has started to define which parts of the architecture to carry forward.

The presentation and access to different variations of data that the company plans to offer through its vehicles creates an architecture challenge. The application portfolio and supportinginfrastructure must connect with multiple cloud services and data repositories in different countries to be able to handle large-scale data.

Enough of the Business Architecture has been defined, so that work can commence on the Information Systems and Technology Architectures. These architectures need to be defined to support the primary business services that the company plans to provide. These services will manage and process the data created by vehicles, paving the way for self-driving vehicles in the future.

The company uses the TOGAF Standard as the basis for its Enterprise Architecture framework.

The EA team reports to the Chief Technical Officer (CTO), who is the sponsor of the EA program.

The CTO requires that the EA team follow the purpose-based EA Capability model as described in:

The TOGAF Series Guide: A Practitioners’ Approach to Developing Enterprise Architecture Following the TOGAF® ADM.

Refer to the scenario:

You have been asked how to decide and organize the work to deliver the requested architectures.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You commence an iteration of ADM Phase A, identifying the stakeholders and revising the Architecture Vision. You perform a Stakeholder Analysis and update the Stakeholder Map created for the strategic architecture so it reflects the stakeholders who are now the most important to the projects that are to be developed. You then request the CTO to make some choices about the Architecture Roadmap and update the Implementation and Migration Plan

B.

You research leading data companies, using your findings to help in developing high-level Target Data, Application, and Technology Architectures. You review the Architecture Vision to determine the level of detail, time, and scope of the ADM cycle phases required for architecture development for the project. You identify and estimate the cost of the main work packages. You then create an Architecture Roadmap and request the Architecture Boa

C.

You look to the superior architecture to help plan your approach. You identify projects, dependencies, and synergies, then decide the order for starting the projects. You then develop high-level architecture descriptions. For each project, you determine how much work is needed, identify reference architectures, and candidate building blocks. You identify the resource needs taking into account cost and value. You document the different optio

D.

You look outside the company to study how other companies organize their data models and application portfolios. You request just enough architecture description for the Application, Data, and Technology Architectures to identify different options. For each project, this includesidentifying architecture and solution building blocks. You then identify solution providers and perform a readiness assessment on the new approaches.

Question 40

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect at a technology company, reporting directly

to the Chief Enterprise Architect. The company supplies personnel and delivers cloud-

based solutions to numerous government agencies.

The nature of the business is such that the data and the information stored on the

company systems is the company's major asset and is highly confidential. The company

employees work remotely and need constant access to the company systems, which is

done by the public infrastructure. They use message encryption, secure internet

connections using Virtual Private Networks (VPNs), and other standard security

measures. The company provides computer security awareness training for all its staff.

The Chief Security Officer (CSO) has noted an increase in distributed denial of service

(DDoS) attacks on companies with a similar profile. The CSO understands that even

with thorough preparation, a major attack could stop employees from being able to do

their jobs. This could lead to a large financial loss, damage to the company's reputation

with customers, and employees being unable to work.

A risk assessment has been completed and the company has looked for cyber insurance

that covers such attacks. The price for this insurance is very high. The CTO has decided

not to get cyber insurance to cover such attacks.

The company follows the TOGAF standard as the method and guiding framework for its

Enterprise Architecture (EA) practice. The Chief Technology Officer (CTO) is the sponsor

of the activity. The practice uses an iterative approach for its architecture development.

This has enabled the decision makers to gain valuable insights into the different aspects

of the business

Please read this scenario prior to answering the question

You have been asked to describe the steps you would take to strengthen the current

architecture to improve data protection.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You would request technology updates from existing suppliers that improve the

company's capabilities to detect, react, and recover from an incident. You

would run a simulated ransomware attack to evaluate the current Enterprise

Architecture's resilience and recovery capabilities. Using the findings, you

would perform a gap analysis of the current Enterprise Architecture, and

prepare change requests to address i

B.

You would run a planning exercise to assess the business continuity

requirements and analyze the current Enterprise Architecture for gaps. You

create a formal change request related to business resilience and maintaining

critical business functions. You would arrange a meeting of the Architecture

Board to assess and approve the change request. Once approved you would

create a new Request for Architecture Work t

C.

You would ensure that business value and cost of continuity measures are

understood by key stakeholders, and that the company has in place up-to-date

processes for managing change to the current Enterprise Architecture. You

recommend that DDoS mitigation be addressed at the infrastructure level to

ensure effective, scalable protection. Changes should be made to the baseline

description of the Technology Archite

D.

You would hold an Architecture Compliance Review with the scope to examine

the company's ability to respond to such attacks. You would identify the

departments involved and have them nominate representatives. You would

then tailor checklists to address the requirement for increased business

continuity and resilience. You would circulate the checklists to the nominated

representatives for them to complete. You w

Question 41

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect working at a vehicle manufacturing

company. The company specializes in buses and coaches. You are part of an

Enterprise Architecture (EA) team that has responsibilities across multiple divisions of

the company. EA provides the company with a comprehensive framework to develop

and manage their manufacturing infrastructure, processes for component production,

and design and testing systems.

The company has a corporate strategy that focuses on switching to electric power for

its vehicles. It has invested heavily in a new standardized design, production efforts,

and major components to use across all its product range. The company has multiple

manufacturing plants in North America, Europe, and in Asia.

Customer demand has caused a backlog of orders because many customers want to

have more environmentally friendly public transportation. There are not enough

electronic components available, which is making it hard to produce products and

meet customer demand. To address this issue, the company has started making the

battery packs themselves and has hired new suppliers.

The EA team is working on a project to improve the process and systems to design,

produce, and test the battery pack. As part of putting the new battery pack into

production, changes to the assembly processes need to be made. A trial has been

completed at a single location. The Chief Engineer, sponsor of the project, and the

Architecture Board have approved the plan to roll out these changes to all plants.

Preliminary Architecture Contracts are being developed to detail the work needed to

put in place the new processes for each location. The EA team leader has called a

meeting to discuss the contracts. It is emphasized that the Architecture Contract will

serve as the key connection between architecture and implementation organizations.

The company mixes internal teams with a few third-party contractors at the locations.

The Chief Engineer is worried that the implementation and deployment will not be

consistent and of satisfactory quality.

The company has an established EA practice. It uses the TOGAF standard as the

foundation for its work including the internal EA framework. Additionally, the company

uses various management frameworks such as business planning, project

management, and operations management.

Refer to the scenario

The EA team leader asks you how you would address the Chief Engineer's concern.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

The contracts must be checked to ensure they have flexibility. For changes

undertaken by internal teams, a memorandum of understanding between the

Architecture Board and the implementation organization is needed. If a

contract is issued to a contractor, it must be a fully enforceable legal contract. If

a deviation from the Architecture Contract is found, the Architecture Board

must grant a dispensation to allow

B.

The contracts must be checked to ensure they can be used to direct and

control the implementation teams. For contracts issued to third-party

contractors, they must be enforceable legal contracts. For internal

development teams, a memorandum of understanding with the Architecture

Board is needed. The Architecture Board must review all deviations from the

Architecture Contract and decide whether to grant a dispen

C.

The contracts must specify goals, measures, acceptance terms, and risks.

Third-party contracts must be legally enforceable. It is advisable to establish a

schedule of compliance reviews at key points in the implementation process.

The Architecture Board must review all deviations from the Architecture

Contract and consider whether to grant a dispensation to allow the process to

be customized for local needs. En

D.

The contracts must be used to manage the architecture governance processes

across the locations. Monitoring tools must be put in place to assess the

performance of each completed battery pack at each location. If a deviation

from the contract is needed, the Architecture Board should allow the

Architecture Contract to be modified for the location. In such cases they should

issue a new Request for Architecture Wo

Question 42

Scenario

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at a large government agency. The agency has multiple divisions.

The agency has a well-established EA practice and follows the TOGAF standard as its method for architecture development. Along with the EA program, the agency also uses various management frameworks, including business planning, project/portfolio management, and operations management. The EA program is sponsored by the Chief Information Officer (CIO), who has actively promoted architecting with agility within the EA department as her preferred approach for projects.

The government has mandated that the agency prepare themselves for an Artificial Intelligence (AI)-first world, which they have called their “AI-first” plan. As a result, the agency is looking to determine the impact and role that AI will play moving forward. The CIO has approved a Request for Architecture Work to look at how AI can be used for services across the agency. She has noted that digital platforms will be a priority for investment in order to scale the AI applications planned. Using AI to automate tasks and make things run smoother is seen as a big advantage. Process automation and improved efficiency from manual, repetitive activities have been identified as the key benefits of applying generative AI to their agency’s business. This will include back-office automation, for example, for help center agents who receive hundreds of email inquiries. This should also improve services for citizens by making them more efficient and personalized, tailored to each individual’s needs.

Many of the agency leaders are worried about relying too much on AI. Some leaders think their employees will need to learn new skills. Some employees are worried they might lose their jobs to AI. Other leaders worry about security and cyber resilience in the digital platforms needed for AI to be successful.

The leader of the Enterprise Architecture team has asked for your suggestions on how to address the concerns, and how to manage the risks of a new architecture for the AI-first project.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend creating an Organization Map to display the links between different parts of the agency. This will help the EA team to find and involve all areas of the agency impacted by this strategic change. Multiple business models should then be created that can be applied to AI-related projects. A meeting will be held with the stakeholders to teach them how to interpret the models and see how their concerns are being addressed. Risk wil

B.

You recommend that the key stakeholders be formally identified. This should include those who will be most helpful for the change to be successful. A Communication Plan should be made to address their needs. This plan should include a report that summarizes the key features of the architecture based on stakeholder requirements and addressing concerns. You communicate with each key stakeholder to make sure their concerns are being addressed.

C.

You recommend conducting an analysis of the stakeholders. This involves documenting the positions, concerns, issues, and cultural factors of each group. This information will shape how the architecture is to be presented and communicated. The concerns and relevant views can then be defined for each group and recorded in the Architecture Vision document. The requirements for addressing risk should be recorded in the Architecture Requirements

D.

You recommend conducting an analysis that separates the different types of stakeholders into groups. They can be divided into categories: corporate functions, end-user organization, project team, external vendors, and external partners. A model will be developed for each stakeholder category to ensure that all the necessary information and actions are taken into account. Meetings will be arranged with stakeholders to verify that their conce

Question 43

Please read this scenario prior to answering the question

You are working as an Enterprise Architect at a large supermarket. The company runs many retail

stores, as well as an online grocery shop. Many of the stores used to remain open 24/7, but the

number has decreased in recent years. Instead, they now focus on fulfilling online orders during

the night.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF standard

for its architecture development method. The EA practice is involved in all aspects of the

business, with oversight provided by an Architecture Board with representatives from different

parts of the business. The EA program is sponsored by the Chief Information Officer (CIO).

Each store uses a standard method to track sales and inventory. This involves sending accurate

timely sales data to a central Al-based inventory management system that can predict demand,

adjust stock levels and automate reordering. The central inventory management system is housed

at the company's central data center.

The company has bought a major rival. The Chief Executive Officer believes that a merger will

enable growth through combined offerings and cost savings. The decision has been taken to fully

integrate the two organizations, including merging retail operations and systems. This means that

duplicated systems will be replaced with one standard retail management system. Also, the

company will reduce the number of applications that are used. The CIO expects significant

savings will be achieved by implementing these changes across the newly merged company.

One improvement that the rival has successfully implemented is the use of hand-held devices

within stores, for both customers and staff. This has increased both customer and staff employee

satisfaction due to the time savings this has brought. The CIO has given the go-ahead to roll out

the devices in all stores but has stated that training on how to use the hand-held devices should

be brief because there are a lot of employees, many of whom are part-time.

The Request for Architecture Work to oversee the merger has been approved. The project has

been scoped and you have been assigned to work on it. Your role includes managing the

architecture for the retail stores.

Refer to the scenario

You have been asked to confirm the most relevant architecture principles for the transformation.

Based on the TOGAF Standard, which of the following is the best answer?

[Note: The sequence of the principles listed in each answer does not matter. You should assume

the company follows the set of principles that are provided in the TOGAF Standard, ADM

Techniques, Architecture Principles chapter. You may need to refer to section 2.6 located in ADM

Techniques within the reference text to answer this question.]

Options:

A.

Maximize Benefit to the Enterprise, Common Use Applications, Data is an Asset, Responsive Change Management, Technology Independence

B.

Control Technical Diversity, Interoperability, Data is an Asset, Data is Shared, Business Continuity

C.

Common Vocabulary and Data Definitions, Compliance with the Law, Requirements Based Change, Responsive Change Management, Data Security

D.

Common Use Applications, Data is an Asset, Data is Accessible, Ease of Use, Business Continuity

Question 44

Please read this scenario prior to answering the question

You are working as the Chief Enterprise Architect within a law firm specializing in personal injury cases. Many of the firm's competitors have improved their litigation strategies, and efficiency by streamlining their processes using Artificial Intelligence {Al).

The CIO has approved a Request for Architecture Work to examine the use of Machine Learning in defining a new Al-driven litigation and finance process for the firm. This process would instruct the lawyers and analysts as to what tasks and portfolio they should work on. The key objectives are to increase task profitability, maximize staff utilization, and increase individual profitability.

The CIO has emphasized that the architecture should enable the fast implementation of continuous Machine Learning. The solution will need to be constantly measured for delivered value and be quickly iterated to success.

Some of the partners have expressed concerns about letting the Al make the decisions, others about the risks associated with use of it for the type of service they deliver. The CIO wants to know if these concerns can be addressed, and how risks will be covered by a new architecture enabling Al and Machine Learning.

Refer to the scenario

You have been asked to respond to the CIO recommending an approach that would enable the development of an architecture that addresses the concerns of the CIO and the concerns of the partners.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You recommend that a Communications Plan be created to address the key stakeholders, the most powerful and influential partners. This plan should include a report that summarizes the key features of the architecture reflecting their requirements. You will check with each key stakeholder that their concerns are being addressed. Risk mitigation and agility will be explicitly addressed as a component of the architecture being developed.

B.

You recommend that an analysis of the stakeholders is undertaken resulting in documenting the stakeholders and their concerns in a Stakeholder Map. The concerns and relevant views should then be defined for each group and recorded in the Architecture Vision document. Therequirements will include risk mitigation through regular assessments. This will also allow a supervised agile implementation of the continuous Machine Learning.

C.

You recommend that all possible models be created for each candidate architecture that will enable the Al and Machine Learning solution. This ensures that all the necessary data and detail is addressed. A formal review should be held with the stakeholders to verify that their concerns have been properly addressed by the models. Agility will be considered during Phase G Implementation Governance.

D.

You recommend creation of a set of business models that can be applied uniformly across all architecture projects. The stakeholders will be trained to understand the business models to ensure they can see that their concerns are being addressed. Risk will be addressed once the Security Architecture is developed, which will happen later to avoid slowing down the agility required by the CIO.

Question 45

Please read this scenario prior to answering the question

You are employed as an Enterprise Architect, reporting to the Chief Enterprise Architect, at a technology company. The company uses the TOGAF standard as the method and guiding framework for its Enterprise Architecture (EA) practice.

The nature of the business is such that the data and the information stored on the company systems is the company's major asset and is highly confidential. The company employees travel a lot for work and need to communicate over public infrastructure. They use message encryption, secure internet connections using Virtual Private Networks (VPNs), and other standard security measures. The company has provided computer security awareness training for all its staff. However, despite good education and system security, there is still a need to rely on third-party suppliers for infrastructure and software.

The Chief Security Officer (CSO) has noted an increase in ransomware (malicious software used in ransom demands) attacks on companies with a similar profile. The CSO recognizes that no matter how much is spent on education, and support, the company could be a victim of a significant attack that could completely lock them out of their important data.

A risk assessment has been completed and the company has looked for cyber insurance that covers ransomware. The price for this insurance is very high. The CTO recently saw a survey that said 1 out of 4 businesses that paid ransoms could not get their data back, and almost the same number were able to recover the data without paying. The CTO has decided not to get cyber insurance to cover ransom payment.

The Chief Technology Officer (CTO) is the sponsor of the EA project. The practice uses an iterative approach for its architecture development. This has enabled the decision makers to gain valuable insights into the different aspects of the business.

Refer to the scenario

You have been asked to describe the steps you would take to strengthen the current architecture to improve data protection.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You would ensure that the business value and cost of continuity measures are understood by key stakeholders and would ensure that the company has in place up-to-date processes for managing change to the current Enterprise Architecture. You recommend that mitigation for a ransomware attach be addressed at the infrastructure level with specific technology controls. Changes should be made to the baseline description of the Technology Architect

B.

You would hold an Architecture Compliance Review with the scope to examine the company's ability to respond to ransomware attacks. You would identify the departments involved and have them nominate representatives. You would then tailor checklists to address the requirement for increased business continuity and resilience. You would circulate to the nominated representatives for them to complete. You would then review the completed checklis

C.

You would run an assessment to identify the business continuity requirements and analyze the

current Enterprise Architecture for gaps. You would create a change request to start a further cycle of architecture work to address changes to mitigate such an attack. You would arrange a meeting of the Architecture Board to assess and approve the change request. Once approved you would create a new Request for Architecture Work to begin an A

D.

You would contact existing suppliers for technology that could enhance the company's capabilities to detect, react, and recover from an incident. You would perform an analysis and assessment of a simulated ransomware attack to evaluate the current Enterprise Architecture's resilience and recovery capabilities. Using the findings, you would prepare a gap analysis of the current Enterprise Architecture. You would prepare change requests to ad