Question 1

How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.

Options:

A.

Use run schedule quantities for in-house production.

B.

Use stock transfer reservations for stock transfer.

C.

Use purchase orders for external procurement.

D.

Use quotations for internal and external procurement.

E.

Use purchasing costs for automated source prioritization.

Question 2

Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

Options:

A.

Work center

B.

Plant

C.

Production version

D.

Material

Question 3

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

Options:

A.

Planned delivery time

B.

Total replenishment lead time

C.

Operation duration

D.

In-house production time

Question 4

Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

Options:

A.

Production orders

B.

Planned orders (firmed)

C.

Planned orders (unfirmed)

D.

ATP quantities

Question 5

During production order creation, several valid production versions are found. How does the system choose the production version?

Options:

A.

Alphanumeric or quota arrangement

B.

Planned order or material number

C.

Validity period or sales order

D.

Lot size or material cost

Question 6

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

In which storage location is the BOM required?

B.

Is the material type allowed in the BOM?

C.

Which base unit of measure does the material have?

D.

What status does the BOM have?

Question 7

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

Options:

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

Question 8

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

Options:

A.

The quantity and value updates are the same.

B.

The same batch management level is used.

C.

The same base unit of measure is used.

D.

The same account category is used.

Question 9

What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

Options:

A.

The Finite Scheduling indicator is NOT set in the strategy profile.

B.

The work center has several individual capacities.

C.

Alternative work centers are fully occupied.

D.

The Change Planning Direction indicator is set in the strategy profile.

Question 10

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

Order (pool) chart

B.

Capacity requirements chart

C.

Orders (dispatched) chart

D.

Work center capacities chart

Question 11

You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

Options:

A.

The order lot size is NOT within the validity range of a production version.

B.

NO production lines are assigned to the production versions.

C.

All production versions for the material are locked.

D.

NO bills of material (BOMs) are assigned to the production versions.

Question 12

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

Options:

A.

Order type

B.

Requirements profile

C.

Requirements type

D.

Planning strategy

Question 13

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.

Options:

A.

Reduced delivery times

B.

Reduced times for final assembly

C.

Option to forecast planning for production resources

D.

Option to use make-to-order production

Question 14

In your plant MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

Options:

A.

Use a specific MRP list.

B.

Use a specific material status.

C.

Use a specific material group.

D.

Use a specific MRP type.

Question 15

Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track and use this information in all areas of logistics?

Options:

A.

Process order management

B.

Engineering change management

C.

Quality management

D.

Batch management

Question 16

For production orders, cost object controlling (COC) can be carried out on an order-related or product-related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.

Options:

A.

Product-related COC is used in manufacturing for co-products.

B.

In product-related COC, all costs are debited and credited to a product cost collector.

C.

In order-related COC, individual production orders do NOT have cost segments.

D.

Order-related COC is beneficial in a flexible production environment.

Question 17

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

Options:

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

Question 18

Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

Options:

A.

To monitor document table changes

B.

To enable integration into a sales order

C.

To save multiple changes for an object

D.

To monitor document object changes

Question 19

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Variable-size item

B.

Work item

C.

Preliminary item

D.

WBS item

Question 20

How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.

Options:

A.

They are created together with the independent requirement for the finished product.

B.

They are created on assembly level during the planning run.

C.

They are created with exact times in Advanced Planning.

D.

They are only created for multilevel bill of material (BOM) structures.

Question 21

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

Options:

A.

You can use trigger points to automatically create rework orders via confirmations.

B.

You can use mass processing to set production orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

D.

You can use mass processing to read PP master data for production orders.

Question 22

Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

Base unit of measure

B.

Industry sector

C.

Selection screen for views

D.

Product type

Question 23

What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.

Options:

A.

Scheduling of an operation takes place as close as possible to the desired date.

B.

Sequencing on multi-activity resources is automatically updated.

C.

Neighboring operations can be moved in both directions in order to create a slot.

D.

Changes are automatically implemented in the complete collective order.

Question 24

Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

Options:

A.

Opening period

B.

Total replenishment lead time

C.

Float after production

D.

Setup time