How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
During production order creation, several valid production versions are found. How does the system choose the production version?
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.
In your plant MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track and use this information in all areas of logistics?
For production orders, cost object controlling (COC) can be carried out on an order-related or product-related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.