Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

SAP C_TS422_2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam Practice Test

Page: 1 / 15
Total 148 questions

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

Options:

A.

Kanban

B.

Picking list

C.

Backflushing

D.

Transfer Order

Question 2

What does it mean for the production planner when MRP works with infinite capacities?

Options:

A.

MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

B.

MRP creates capacity requirements without checking the capacity of a work center.

C.

MRP creates capacity requirements only if the work center has sufficient capacity.

D.

MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Question 3

For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Options:

A.

The lot size range must be within the lot-size range of the assigned routing.

B.

The assigned routing must be a rate routing.

C.

The deletion flag must NOT be set for the bill of materials (BOM) or the routing.

D.

The assigned routing and bill of materials (BOM) must be valid in the entire validity period.

E.

The assigned routing must NOT have alternative sequences.

Question 4

Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question

Options:

A.

Production list

B.

WIP list

C.

Production overview

D.

Operation list

E.

Planning file entries

Question 5

You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?

Options:

A.

Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where V Dthe

component is used

B.

Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.

C.

Enter the operation scrap and set the net indicator in the component of the bill of

material of the assembly.

D.

Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.

Question 6

How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

Options:

A.

Order-related

B.

Cost-related

C.

Product-related

D.

Milestone-related

Question 7

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.

Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

Options:

A.

Infinite resource and infinite strategy

B.

Finite resource and finite strategy

C.

Finite resource and infinite strategy

D.

Infinite resource and finite strategy

Question 8

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

Options:

A.

In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material

B.

Manually firm all planned orders for materials within the replenishment lead time of the material

C.

In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material

D.

In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

Question 9

Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.

Options:

A.

SAP S/4HANA private cloud

B.

SAP S/4HANA Professional services cloud

C.

SAP S/4AHANA Enterprise Management cloud

D.

SAP S/4HANA on premise

Question 10

What is the first step in the MRP run?

Options:

A.

BOM explosion

B.

Source determination

C.

Net requirements calculation

D.

Lot size calculation

Question 11

Which data object can be updated with the scheduling results of a routing?

Options:

A.

Production scheduling profile

B.

MRP profile

C.

Production version

D.

Material master

Question 12

Which task list types can have parallel sequences? There are 2 correct answers to this question.

Options:

A.

Routings (N)

B.

Master recipes (2)

C.

Rate routings (R)

D.

Reference operation sets (S)

Question 13

Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

Options:

A.

MBO2

B.

MMBE

C.

MIGO

D.

MBNL

Question 14

What is the purpose of collective orders?

Options:

A.

To post production costs on a cost collector instead of the production order

B.

To combine order management of co-products and by-products with the main product

C.

To post any component withdrawals single back flush with order confirmation

D.

To manage production orders for an entire finished product on multiple levels

Question 15

What are examples of assignment objects you can maintain in the Engineering Workbench?

There are 3 correct answers to this question.

Options:

A.

Material to routing assignment

B.

Material to bill of materials (BOM) assignment

C.

Routing to sequence assignment

D.

Material to production version assignment

E.

Component assignment

Question 16

You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

Options:

A.

When you create a sales order

B.

When you deliver a sales order

C.

When the MRP results are saved

D.

When you create a planned order

Question 17

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?

Options:

A.

Costs

B.

Quota arrangement

C.

Delivery date

D.

Vendor rating

E.

Component availability

Question 18

What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Quantity

B.

Scrap percentage

C.

Installation point

D.

Item type

Question 19

Which of the following is a valid sequence of the main activities in product on order processing?

Options:

A.

Creation, scheduling, release, variance calculation, confirmation

B.

Creation, release, scheduling, material withdrawal, confirmation

C.

Creation, scheduling, release, material withdrawal, confirmation

D.

Creation, staging, release, material withdrawal, confirmation

Question 20

In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.

Options:

A.

Material master of the finished product

B.

Material master of the finished product

C.

Work center, in the production supply area

D.

BOM, in the item for the material

Question 21

Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.

Options:

A.

MRP Live can priorities demand from sales orders

B.

MRP Live can propose alternative solutions

C.

MRP Live can create production orders automatically

D.

MRP Live can plan materials with recursive BOMs

Question 22

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

Options:

A.

Queue time

B.

Float before production

C.

Pick/pack time

D.

Wait time

E.

Move time

Page: 1 / 15
Total 148 questions