Question 1

Which of the following physical sample categories can you create from a primary sample (2 correct ans )

Options:

A.

mixed sample

B.

drew sample

C.

dip sample

D.

pool sample

E.

reserve sample

Question 2

Your consumer wants to receive quality certificates from its venders electronically. Where do you define the data and PDF transfer?

Options:

A.

In the certificate control in a Q-info Record in procurement

B.

In the certificate profile

C.

In the definition of an intermediate document (Idoc)

D.

In the master inspection characteristic (MIC)

Question 3

You have assigned a dynamic modification level to an inspection plan, which dynamic modification criterion is pre-defined and not editable?

Options:

A.

Customer

B.

Vendor

C.

Material

D.

Manufacturer

Question 4

Which of the following documents can you use as a reference document when creation a customer claim?(2 correct ans )

Options:

A.

Material document

B.

Delivery

C.

Quotation

D.

QM order

E.

Sales order

Question 5

Your costumer wants to determine a critical defect class

Which of the following function are possible during results recoding?

Correct 2 ans

Options:

A.

Trigger a subsequent inspection lot

B.

Trigger a workflow

C.

Active a quality notification

D.

Tighten the quality level

Question 6

What must you do in configuration to enable defects recording during an inspection with inspection lots? Note : 2 correct answer

Options:

A.

Activate the work flow template

B.

Define the defect report type

C.

Activate reference to Existing notifications.

D.

Assign the notification type to the inspection type.

Question 7

Your customer plan to use Test Equipment Management as part of QM.

What event triggers the creation of an inspection lot for calibration inspection?

Options:

A.

Release of a maintenance order

B.

Scheduling a maintenance plan

C.

Assignment of Equipment to a maintenance plan

D.

Creation of maintenance order

Question 8

A buyer wants to quality management department to approve a new vender malarial

-combination.

After activating the QM in procurement process , what the quality management

department ensure in......

Correct 2

Options:

A.

A quality agreement for vendor master exists

B.

The material master has a relevant QM Control key assigned to it

C.

The material master has an active inspection type

D.

The inspection plan includes a relevant control key at operation level

E.

A valid release quality info record exists

Question 9

You create a supplier claim notification with reference to material document year, number and item from a goods receipt for the PO What information is copied to the notification?

Note : 3 correct answer

Options:

A.

Advanced Shipping number

B.

Purchasing document number and item

C.

Quantity and unit

D.

Inspection lot number

E.

Material number

Question 10

Your customer uses MIC and requests automatic defect recording

After configuration defect recording the implementation Guide ,which additional steps must you perform to satisfy customer

requirements?

(2 correct ans)

Options:

A.

Select the radio button to activate quality notification in the defect class

B.

Assign a notification type to an inspection type

C.

Activate defects recording in the characteristic control indicator for your MIC

D.

ssign an inspection method to your MIC

Question 11

Your customer wants to automatically valuate the overall results of an audit using the standard

Which valuation method book scores for the overall result?(2 Correct ans )

Options:

A.

Valuation mode

B.

Non relevant indicator

C.

Qualitative valuation

D.

Quantitative valuation

Question 12

The QM control key in the procurement data of the material master controls all but one of the following indicator(Which function does not control) ?

Options:

A.

Delivery release

B.

Certificate Management

C.

Invoice Block

D.

First sample inspection