Question 1

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

Options:

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

Question 2

The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

Options:

A.

A purchase requisition can be created automatically as soon as the order is saved.

B.

The maintenance order can be set to TECO before the invoice is created

C.

A goods receipt can be posted after the maintenance order is technically completed.

D.

A purchase order is created automatically as soon as the order is saved.

E.

A purchase requisition will ALWAYS be created as soon as the order is saved.

Question 3

Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question

Options:

A.

SAP Service and Asset Manager provides single sign-on functionality.

B.

SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP

C.

SAP Service and Asset Manager can be used offline.

D.

SAP Service and Asset Manager is available only for the iOS platform.

E.

SAP Service and Asset Manager can run on smart watches.

Question 4

How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

Options:

A.

Through Best Practices scope items 4HH and 4HI.

B.

Phase-based maintenance is always active in all S/4HANA 2021 editions and above

C.

By installing the corresponding enhancement pack and activating the related business function

D.

By manually activating the corresponding Business Feature in case Best Practices are not used.

Question 5

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

Reservations are created only after a material availability check has been performed

C.

For the combination of order type and planner group, you can decide when reservations are created

D.

All open reservations are closed when the maintenance order is set to TECO.

Question 6

You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

Options:

A.

Scheduling indicator

B.

Scheduling period

C.

End Date for Scheduling

D.

Call horizon

Question 7

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by (monthly performance x 12)

B.

Cycle length divided by annual performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance/365)

Question 8

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

Options:

A.

Planned date of the next call, independent of maintenance order dates

B.

Actual finish date of the maintenance order

C.

The date of the final confirmation

D.

Technical completion date of the maintenance order

Question 9

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Cancel status Released.

B.

Change the pronty

C.

Book a goods receipt.

D.

Change the estimated costs.

Question 10

Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question

Options:

A.

Within a maintenance order

B.

In the list editing (single-level) for maintenance orders

C.

In the report Material: Where-Used List

D.

In the material reservation list in inventory management

Question 11

What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?

Options:

A.

It is based on an SAP Fiori tile catalog.

B.

It provides only HTML5-based apps

C.

It can be assigned directly to the user via personalization

D.

It is assigned via a portal role.

Question 12

Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question

Options:

A.

Lock or unlock the order

B.

Update the estimated costs

C.

Change the settlement rule

D.

Change the planned costs

Question 13

How do you map a counter replacement in SAP S/4HANA Asset Management?

Options:

A.

Deactivate the current counter and create a new counter.

B.

Create a new measurement document marked as a counter replacement.

C.

Create a new measurement document and assign a valuation code for counter replacement.

D.

Assign a catalogue type for counter replacement to the measuring point category.

Question 14

How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

Options:

A.

It always uses the risk-based assessment for prioritization.

B.

It is a new business object with no connection to a maintenance notification.

C.

It is mandatory to assign a task list to the maintenance request.

D.

It contains an additional screening phase where requests can be accepted or rejected.

Question 15

How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Via cost center assigned to a personnel number

B.

Via cost center and activity type

C.

Via organizational unit and personal hourly rate

D.

Via activity type and hourly rate

Question 16

Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

Options:

A.

Plan repair work for the responsible work center

B.

Assign a production resource tool (PRT) to the operation

C.

Complete the malfunction report

D.

Verify planned and actual costs

E.

Find malfunction records already created in a list

Question 17

You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

Options:

A.

Warranty category

B.

Usage period

C.

Object information

D.

Measuring point category

E.

Status profile

Question 18

You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

Options:

A.

Set the call horizon to 25%.

B.

Set the call horizon to 75%

C.

Set the offset to 3 months

D.

Set the call horizon to 90 days.

Question 19

What do you have to consider when planning maintenance work that is to be carried out by an external company?

Options:

A.

If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

B.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

For the maintenance order type, you have to assign the Enhanced Procurement Mode.

Question 20

You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

Options:

A.

Edit classification data and characteristics.

B.

Create a task list for functional location

C.

Assign documents

D.

Change a reference location.

E.

Assign a subordinate piece of equipment.

Question 21

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

Options:

A.

Generate Inspection Lols within the checklists view.

B.

Link PM task list with assigned inspection point type to a maintenance item.

C.

Record the usage decision for an Inspection Lot

D.

Generate Inspection Lots assigned to maintenance order headers.

Question 22

What do you have to consider when setting up phase-based maintenance?

Options:

A.

It is mandatory for breakdown and preventive maintenance.

B.

It is not possible to configure the nine delivered phases.

C.

It can be used with any existing order type.

D.

It comes preconfigured when using the relevant Best Practices scope items.

Question 23

You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question

Options:

A.

The individual maintenance of the cost center in the equipment master record

B.

The reference functional location of the superior functional location

C.

The cost center of the superior equipment

D.

The cost center of the related maintenance work center

Question 24

Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

Options:

A.

Completion data

B.

Maintenance activity type

C.

Call object

D.

Change documents

E.

Order type