Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

Salesforce AP-223 CPQ and Billing Consultant Accredited Professional Exam Practice Test

Page: 1 / 10
Total 101 questions

CPQ and Billing Consultant Accredited Professional Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

Universal Containers sell a product bundle named “Corporate IT Solutions”. One of the product options inside this bundle is named Hardware Firewall Universal Containers has a requirement where if the customer has purchased a hardware firewall in the past, the hardware firewall product option should be hidden while configuring the bundle.

The CPQ admin has created a product rule to handle this requirement. What should the evaluation event of the product rule be set to?

Options:

A.

Always

B.

Save

C.

Load and Edit

D.

Load.

Question 2

Which is the correct sequence of evaluation events for a price rule,quote calculator plugin (QCP) and CPQ package pricing engine?

Options:

A.

internal initialization →calculate formulas →calculate quantities →on Initialization → Before Calculate → On Calculate → Price Waterfall Calculation → After Calculate

B.

internal initialization →calculate formulas →calculate quantities →Price Waterfall Calculation →on Initialization → Before Calculate →On Calculate →After Calculate

C.

internal initialization →on Initialization→ Before Calculate →calculate quantities→ On Calculate→Price Waterfall Calculation→ After Calculate→calculate formulas

D.

internal initialization →on Initialization→calculate formulas → Before Calculate→calculate quantities→ On Calculate→Price Waterfall Calculation→ After Calculate

Question 3

Universal Containers sell boxes based on size. Price for a specific product is based on the selection of length and width and height. which cpq pricing functionality should be used here?

Options:

A.

Percent of total

B.

Multi Dimensional Quoting

C.

Discount Schedule

D.

Price Rule with lookup table

Question 4

Universal Containers has recently implemented and released CPQ to users in their production environment. After an extensive testing Cycle in a sandboxed environment. One of the automations implemented was to set every new quote created as "primary" at the time of creation in order to save clicks. Users immediately began to report errors when trying to create quotes in the production environment for the first time. What could have caused this issue?

Options:

A.

The User did not execute post-installation scripts upon their first login to CPQ.

B.

The User did not have the proper access to the Opportunity Product object.

C.

The User did not have the proper access to the Quote Line object.

D.

The User did not have the proper access to the Quote Object.

Question 5

Which three documents help a revenue cloud consultant better understand the client’s Revenue Cloud Project requirements before speaking for the first time in a scoping session?

Options:

A.

A sample proposal the client provides to their customers

B.

Brochures that provided detail to the products and services the client offers

C.

The latest release notes found at help salesforce.com>salesforce CPQ patch notes

D.

An approval matrix documentation that describe the approvals needed before a quote is sent to the customer

E.

The clients income statements and balance sheet.

Question 6

What Planning Strategies Should be Taken to Make User Acceptance Testing (UAT) efficient?

Options:

A.

Execute all tests on behalf of the customer

B.

Define and agree on acceptance criteria with customer

C.

Issue change orders for all incidents that arise during testing

D.

Train UAT testers on the new functionality

E.

Finalize test plans before the build Phase completes(Choose 3 options)

Question 7

Our customer is headquartered in the US but has operations in Germany. The German operation has CPQ installed in their own EU instance of Salesforce. Which Service Region should be defined for the European instance of CPQ in order to optimize calculation performance?

Options:

A.

Service Region has no performance impact

B.

North America

C.

Japan

D.

Europe

E.

Australia

Question 8

An Invoice Scheduler is set up with Target Date = January 15 and Bill Usage ChargesFalse.

Which setting will generate invoice lines?

Options:

A.

Order Products with Next Billing Date equal to or earlier than January 15

B.

Usage Summaries with Next Billing Date equal to or earlier than January 15

C.

Order Products with Next Billing Date equal to or after January 15

D.

Order Products with Next Charge Date equal to or earlier January 15

Question 9

Universal Containers sell a product bundle named “Corporate IT Solutions”. One of the product options inside this bundle is named Hardware Firewall Universal Containers has a requirement where if the customer has purchased a hardware firewall in the past, the hardware firewall product option should be hidden while configuring the bundle.

The CPQ admin has created a product rule to handle this requirement. What should the evaluation event of the product rule be set to?

Options:

A.

Always

B.

Save

C.

Load and Edit

D.

Load.

Question 10

How does Hold Billing work?

Options:

A.

It Prevents invoice document generation and stops email notifications from going out to the customer.

B.

The Hold Billing field is set to “yes” until the order is activated. Upon order activation the field will be automatically set to “no”.

C.

It suspends invoicing for that order product until the field is set to “no”. Invoices lines will be created to account for the time when hold billing was set to “yes”

D.

It suspends invoicing for that order product until the field is set to “no”. Invoices lines will be created only for invoices after hold billing was set to “yes”.

Question 11

Universal Containers is implementing Revenue Cloud for a business unit that already uses a legacy CPQ system, what consideration should be taken as the implementation partner?

Options:

A.

Map legacy CPQ system capabilities to ensure there is no loss of logic from the older system

B.

Customize Revenue Clouds user interface so the customer experiences no major interruption to the new system

C.

Transform the customer’s business processes, capture new requirements for the new Revenue Cloud technology

D.

Keep the legacy CPQ system and build to the gaps in Revenue Cloud so the customer can use both systems to satisfy requirements

Question 12

A Revenue Cloud Customer has posted a cash payment that was created on Account A by mistake. What are the steps to apply this to the correct invoice on Account B?

Options:

A.

Un-allocate the Payment if allocated, create a refund and then create a new payment for Account B

B.

Un-allocate the payment if allocated and reparent the payment to Account B

C.

Allocate the Payment to an invoice on Account B.

D.

Set the payment status to cancelled and create a new payment on Account B.

Question 13

Which 3 data migration strategies are appropriate for migrating a customer’s in-flight quote from another quoting tool into salesforce CPQ?

Options:

A.

Migrate opportunity line item data via data loader ,ensure “disable initial quote sync” is disable

B.

adopt a change management strategy that requires sales users recreate in-flight quotes within salesforce CPQ

C.

migrate opportunity , quote ,and quote line data via data loader

D.

utilize the import lines feature to migrate quote & quote line data

E.

Migrate contract and subscription data via data loader

Question 14

A Revenue Cloud Project has a requirement where a Product can be either taxable or tax exempt depending on a

custom field that holds the industry.

what is the appropriate solution to address this Requirement?

Options:

A.

Use Automation to set Tax Treatment Based on the value of the custom field.

B.

Use Automation to set Billing Rule Based on the value of the custom field.

C.

Use Automation to set Tax Rule Based on the value of the custom field.

D.

Use Automation to set Revenue Recognition Rule Based on the value of the custom field.

Question 15

Our customer is headquartered in the US but has operations in Germany. The German operation has CPQ installed in their own EU instance of salesforce.

Which service region should be defined for the Europeans instance of CPQ in order to optimize calculation performance?

Options:

A.

North America

B.

japan

C.

europe

D.

Australia

E.

Server region has no performance impact

Question 16

Universal containers recently migrated legacy contracts and subscriptions into salesforce in order to facilitate amendments and renewals in CPQ .however ,sales user sure getting the ‘attempt to de-reference a null object’ error when amending the legacy contract. what is the most likely cause for the error?

Options:

A.

Migrated contracts and subscriptions cannot be amended using salesforce CPQ

B.

Amendment of legacy contract and subscription data requires asset-based renewal method

C.

Required fields are missing or incorrectly populated on the legacy contract and subscription data

D.

Legacy subscription data are missing a lookup to a source quote line record

Question 17

universal containers has setup a partner type custom field on the CPQ quote object in order to ensure partners receive discounts. setting the partner type on the quote should cause a recalculation because the field is an input to the product prices. how can partner type queue a new calculation for the quote?

Options:

A.

Add the partner type field to the calculating fields field set

B.

Refresh post install scripts

C.

Setup a quote calculator plugin to ensure the custom field triggers

D.

calculation Include the field in a custom metadata setting

Question 18

What are three reasons to establish a governance structure as part of your Revenue Cloud project?

Choose 3 answers

Options:

A.

To get agreement on the roles and responsibilities of the implementation team and customer

B.

To establish a communication plan between the implementation team, the customer and the work is coordinated between them

C.

To ensure the implementation team can work independently for most of the project with little to no input from the customer

D.

To ensure the implementation team is aligned with the customer on assigned work

E.

To assign more work for the customer when it comes to designing and building the Revenue Cloud solution

Question 19

What are three risks when using too many cross object formula fields in a Revenue Cloud Project?

Options:

A.

Formula field data is not always available during CPQ quote calculation

B.

Formula fields have unlimited access to object many relationships away which makes it vulnerable to data changes.

C.

They are computationally Expensive.

D.

They can easily exceed limits if not carefully designed and tested

E.

Formula Fields are editable, after the calculation completes the sales user or process automation can overwrite its value

Question 20

What does INVEST stand for in the INVEST criteria when defining user stories?

Options:

A.

Independent, Negotiable, Valuable, Estimable, Small, Testable

B.

Independent, Negotiable, Valuable, Equal, Small, Testable

C.

Independent, Negotiable, Valuable, Estimable, Sequential, Testable

D.

Investable, Negotiable, Valuable, Estimable, Small, Testable

Question 21

What are three key characteristics of an implementation partner leading are venue cloud scoping session?

Options:

A.

Excellent Communication Skills both verbal and written

B.

Being effective at planning, monitoring and reviewing

C.

Having deep knowledge of competitor Products

D.

Experience in a selling role with quota responsibilities

E.

Understanding design pitfalls and Mitigation actions to course correct.

Question 22

Which usage summary field can be used as an external ID to simplify usage uploads after amendments?

Options:

A.

Legal entity

B.

invoice run

C.

auto number

D.

source

E.

matching ID

Question 23

Which is the correct sequence of evaluation events for a Price Rule, QuoteCalculator Plugin (QCP) and CPQ Package Pricing Engine?

Options:

A.

Internal Initialization -> On Initialization -> Before Calculate -> Calculate Quantities ->»On Calculate -> Price Waterfall Calculation -> After Calculate -> Calculate Formulas

B.

Internal Initialization -> Calculate Formulas -> Calculate Quantities -> On Initialization ->Before Calculate -> On Calculate -> Price Waterfall Calculation -> After Calculate

C.

Internal Initialization -> Calculate Formulas -> Calculate Quantities -> Price Water fall Calculation ->On Initialization -> Before Calculate -> On Calculate -> After Calculate

D.

On Initialization -> Before Calculate -> On Calculate -> After Calculate -> Internal Initialization -> Calculate Formulas ->» Calculate Quantities -> Price Waterfall Calculation

E.

Internal Initialization -> On Initialization -> Calculate Formulas -> Before Calculate -> calculate Quantities -> On Calculate -> Price Waterfall Calculation -> After Calculate

Question 24

How can a Revenue Cloud Consultant create a new payment Method for a credit card that will be saved for future Payments?

Options:

A.

Enter the credit card details into a new payment Method record Click the Tokenize button

B.

From the Payment credit cards related list, click the new credit card button.

C.

Enter the credit card details into a new payment method record. salesforce users should use platform encryption for PCI Compliance.

D.

From the Account, Payment Method related list, then click the new Payment Method Credit Card button.

Question 25

A Revenue Cloud user story for a Subscription-based Company Looking to replace their legacy system states “As a pricing Manager, bulk discounts will include previously purchased quantities for pricing calculations on the quote in order to reward loyal customers.

What should be included in the design of this solution?

Options:

A.

Custom Action to retrieve Purchased quantities from an external source

B.

Contracts, Subscriptions and Assets should be populated with historical data.

C.

Use a summary variable targeting the subscription object with a Price Rule.

D.

Legacy Orders and invoices should be migrated.

E.

Discount schedules with Cross Orders checked. (Choose 2 options)

Question 26

A revenue cloud customer has posted a cash payment that was created on account A by mistake. what are the steps to apply this to the correct invoice on account B?

Options:

A.

Allocate the payment to an invoice on account B

B.

Allocate the payment if allocated, create a refund and then create a new payment for account C. Allocate the payment if allocated and reparent the payment to account B

C.

Set the payment status to canceled and create a new payment on account B.

Question 27

Which 3 objects are updated when posting an invoice?

Options:

A.

Order Product

B.

Quote

C.

Invoice Line

D.

Quote Line

E.

Invoice

Question 28

A revenue cloud user story states “Sales users should have the ability to create new quotes with established rate cards and account specific discounts because current customers are entitled to the pricing that was originally negotiated'' .in addition to loading data to accounts, contracts, quotes what other object will need to absorb legacy data?

Options:

A.

Contracted Pricing

B.

Subscription

C.

Order Products

D.

Entitlements

Question 29

A Revenue Cloud Consultant Surveys a customer’s Sales Cloud implementation and discovers Multiple triggers, Workflow and flow Processes applied to the Opportunity object. what is the most appropriate recommendation to the customer before designing a Revenue Cloud Solution?

Options:

A.

Recommend using a single automation type for best Performance.

B.

Recommend to enable the CPQ Package Setting for “Large Quote Threshold” to an appropriate value in order to prevent future performance issues.

C.

Recommend continued use of multiple automation types where Revenue Cloud capabilities cannot address the business requirements

D.

Recommend the current automations are appropriate, optimize further if necessary.

Question 30

Universal Containers is reporting a platform governor limit issue while saving a quote with a large number of quote

line items. What should the Revenue cloud consultant recommend to address the issue?

Options:

A.

Enable the CPQ package setting for “quote batch size” to a value which is less than the number based on the volume testing to avoid platform gov. limits

B.

Enable the CPQ Package setting for “Large Quote Experience”

C.

Enable the CPQ package setting for “Large Quote Threshold” to a value which is less than the number based on the volume testing to avoid platform gov. limits

D.

Enable the CPQ package setting for “Large Quote Threshold” to a value which is less than the number of lines which triggered the error during testing.

Page: 1 / 10
Total 101 questions