Which PCIe slot supports 4-port FC cards on FlashArray//XL?
At the completion of an upgrade, which command is used to send phonehome logs?
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?
What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade.
Which command should the Implementation Engineer run on the new controller to determine its model?
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
What should an Implementation Engineer do when installing rails in a threaded-hole rack?
When installing the first DirectFlash Shelf on a FlashArray//XR2/3, what mezzanine ports are used on the controllers?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers.
Which command should the Implementation Engineer run to list the NTP servers that have been configured?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?
After runningpuredb run giveback --safecommand once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversation Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
A customer would like to reduce SafeMode settings for retention and eradication with their current policy.
How is authorization obtained to make the requested changes?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).
What action should the Implementation Engineer perform?
An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?