Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

Oracle 1z0-1091-22 Oracle Utilities Meter Solution Cloud Service 2022 Implementation Professional Exam Practice Test

Page: 1 / 5
Total 51 questions

Oracle Utilities Meter Solution Cloud Service 2022 Implementation Professional Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

Different validation, estimation, and editing (VEE) rules can be applied based on the VEE roles that categorize the source of the measurement data.

Which THREE VEE roles are provided as part of the base product?

Options:

A.

Manual override

B.

Initial load

C.

Retry

D.

Customer provided

E.

Estimation

Question 2

Which THREE statements are true about the Subtractive Interval Data functionality?

Options:

A.

The IMD load processes calculate consumption in engineering units.

B.

A new reading condition field ensures that you do not lose the reading quality when a meter's consumption is estimated.

C.

You can optionally validate for rollover exceptions and negative consumption calculations.

D.

It validates consumption in initial measurement data (IMD).

E.

It converts engineering units into reads.

Question 3

Oracle Utilities Meter Data Management (MDM) DataConnect facilitates extraction of data for use in external applications such as energy management systems.

Which TWO can you export in the MDM version of DataConnect?

Options:

A.

Billing determinants

B.

Service points and install events

C.

Usage measurement data

D.

Configuration data

E.

Device events

Question 4

In which THREE situations would you use a dynamic option?

Options:

A.

The scalar meter-read download process creates an activity each time a scalar measuring component is scheduled to be read.

B.

The utility has a program where customers can optionally participate in demand response (DR) programs.

C.

An option is specified on a service point to allow Validation, Estimation, and Editing (VEE) processing to dynamically invoke a group of VEE rules depending on a characteristic.

D.

A consumer receives credit for consumption during a critical peak period (CPP) event that is lower than their "normal* consumption.

E.

The utility has a program that credits customers for conservation during critical peak periods.

Question 5

A business needs a new Service Order process that includes meter commands. Which THREE options should you configure to build this process?

Options:

A.

Measuring component type

B.

Device configuration type

C.

Activity type

D.

Communication type Message sender

Question 6

Momentary outages are very short-term outages where an outage event is sent and a restoration event is received in less than a few minutes.

Which TWO system components would you configure to ignore momentary outages?

Options:

A.

Reporting categories

B.

AMI commands

C.

Device events

D.

Activities

Question 7

Which step should you perform to configure commands in a SaaS environment?

Options:

A.

Create Object Storage locations (or buckets).

B.

Configure File Storage Configuration (Fl-RleStorage) extendable lookup.

C.

Configure the following processing methods: Unit of Measure (UOM) Translation, Initial Measurement Creation, and Device Event Mapping.

D.

Create key rings and key pairs.

E.

Configure outbound and inbound communications (Request/Response model).

Page: 1 / 5
Total 51 questions