Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

Huawei H19-321 Huawei Certified Pre-sales Specialist - Service Solution Exam Practice Test

Page: 1 / 27
Total 265 questions

Huawei Certified Pre-sales Specialist - Service Solution Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

Huawei's FusionSphere migration service refers to a service provided by Huawei that migrates business systems on a customer's physical server or other virtualization platform to a Huawei virtualization platform. For example, the X86 architecture business system was migrated to Huawei's FusionSphere virtualization platform.

Options:

A.

True

B.

False

Question 2

Which of the following activities is not included in big data performance tuning?

Options:

A.

Performance monitoring

B.

Cluster performance analysis

C.

Component performance information collection

D.

ETL architecture consulting

Question 3

What is not the key point of data center L1 total integration service expansion?

Options:

A.

Project initiation phase

B.

Brand operation

C.

Competition-based bid guidance

D.

Operational optimization recommendations

Question 4

UniSTAR SCT Configurator "Manually Insert Temporary Service Part" function, in the "Insert Service Part" dialog box What do I need to enter manually? (Multiple choice)

Options:

A.

Part number

B.

Part model

C.

quantity

D.

Catalog price

E.

The part description

F.

dimension

Question 5

Resource preparation is one of the most important links before the implementation of the data center project, and it also directly determines the quality and progress of the construction. Generally, preparation is made from the following five points of man, machine, material, law and ring.

Options:

A.

True

B.

False

Question 6

The following modules are not included in the SCT quotation for IP solution implementation services?

Options:

A.

Install the service

B.

Implementation

C.

Test validation

D.

Migration implementation

Question 7

Huawei's training and certification has built different delivery resources for customers, channels, students, and people, of which channel-oriented training institutions are mainly channel-oriented training institutions.

Options:

A.

Huawei Training Centers and Branches

B.

Huawei-licensed training centers

C.

Huawei School of Information and Network Technology

D.

Huawei elearning

Question 8

What are the following outputs of IP network planning and design services? (Multiple choice)

Options:

A.

Requirements analysis/modeling scenarios

B.

Network migration/implementation

C.

Gap/risk analysis report

D.

Web presentation feasibility assessment report

Question 9

What is the value of cloud infrastructure planning and design for customers? (Multiple choice)

Options:

A.

Cloudify computing, storage, and network resources

B.

Implement unified resource management and operations through operations, operations components, and operations

C.

Help users achieve efficient use of IT resources, agile operations, and streamline operations

D.

Multi-data center unified cloud services, unified O&M

E.

Unified access management for multi-resource pooling and heterogeneous virtualization

Question 10

Ip network planning and design services include customer-based simulation and simulation.

Options:

Question 11

The currently released Hi-Care maintenance service package does not involve any of the following field service levels.

Options:

A.

7x10xND

B.

5x10x4

C.

7x24xND

D.

7x24x4

Question 12

the data center L1 layer industry in the deepening design stage review content is correct.

Options:

A.

Tender documents

B.

Construction drawings

C.

Design standard specifications

D.

Requirements confirmation document

Question 13

the following description of the data center location, which is wrong.

Options:

A.

The power supply is stable and reliable, the transportation and communication are convenient, and the natural environment is clean

B.

There are no special requirements for equipment transportation, pipeline laying, and lightning induction

C.

Stay away from flood and fire hazard areas

D.

Keep away from strong vibration and noise sources

Question 14

What kind of data room is idS2000?

Options:

A.

Building-style data room

B.

Modular data room

C.

Container data room

Question 15

What are the following service contents that are not part of the SmartNOS service product?

Options:

A.

Network optimization

B.

Change support

C.

Log analysis

D.

Spare parts go first

Question 16

Which of the following products comes with warranty service that is not basic maintenance?

Options:

A.

Digital pass

B.

transmit

C.

storage

D.

access

Question 17

TiEr2 data center redundancy is ().

Options:

A.

redundancy

B.

fault tolerance

C.

Online maintenance

D.

essential

Question 18

When using the UniSTAR SCT Configurator to report the service fee, if you find that the "submitted" device quotation cannot be used, the "Generated Service Quotation" cannot be used "Features, what are some of the following issues that may exist? Correct answer (multiple choice)

Options:

A.

Quotations for the distribution of stockpiled goods

B.

The country in which the BOQ is located is not the current country

C.

The BOQ itself is the service BOQ

D.

BOQ is read-only SOQ (for example

E.

SCT imported change quotes).

F.

A BOQ is a split service quotation

Question 19

The smaller the PUE value, the higher the degree of greening of a data center.

Options:

A.

True

B.

False

Question 20

belongs to the data center L1 integration service interface is.

Options:

A.

Land planning

B.

Civil

C.

electric

D.

correspondence

Question 21

Which of the following sales scenarios does not require a separate maintenance service?

Options:

A.

Digital Communication products require 1 year of basic maintenance service

B.

Server products require 3 years of Gold+ service

C.

Digital Solution products require 1 year of standard maintenance services

D.

Storage products require 5 years of standard + maintenance services

Question 22

What is the quotation method of integrated project management?

Options:

A.

Standard manual quotation

B.

SCT

C.

Configurator

Question 23

Huawei platform software and general middleware services include: Fusionlnsight Planning and Design Service, Fusionlnsight Solution Implementation Service, Big Data Development Support Service, and Fusionlnsight Clustering.

Options:

A.

True

B.

False

Question 24

Huawei's evaluation and optimization service products can help customers improve network performance and drive product sales.

Options:

A.

True

B.

False

Question 25

The pre-assessment service is one of the extension actions of the IP network evaluation optimization service.

Options:

A.

True

B.

False

Question 26

why data center L1 construction to do total integration (multiple choice)

Options:

A.

20% shorter delivery times

B.

Efficiency increased by N times

C.

TCO Save 10%.

D.

Designed and obtained

Question 27

IP planning and design services are more down-to-earth than planning consulting services, the former takes detailed design as the work center, and the latter takes top-level architecture consulting as the mainstay.

Options:

A.

True

B.

False

Question 28

Agile data center planning and design and solution implementation service applicable scenarios (multiple choice)

Options:

A.

All SDN network scenarios

B.

Sell Agile Controller-DCN

C.

Data center agile network scenarios

D.

Sell Agile Controller-campus

Question 29

What does Huawei's management training include? (Multiple choice)

Options:

A.

Strategy and execution

B.

Team management and motivation

C.

Huawei's development history

Question 30

ITO services, refers to enterprises focus on their core business, and its IT systems in the form of long-term contracts (3-5 years or even longer) in full or part outsourcing to professional information technology services companies.

Options:

A.

True

B.

False

Question 31

Compared with other certifications in the industry, Huawei attaches great importance to the project experience and hands-on ability of engineers, so which link is added to the HCIE exam?

Options:

A.

Panel interview

B.

Project experience presentation

C.

Development testing

D.

Learner discussion

Question 32

What service content is not included in the data migration service?

Options:

A.

Information Gathering

B.

Scheme design

C.

Migration implementation

D.

Business issuance

Question 33

Huawei's service migration solution is divided into three main scenarios, which is the error? ()

Options:

A.

P2V

B.

Migrate between cloud platforms of other vendors

C.

V2V

D.

Internal migration of HUAWEI CLOUD platform

Question 34

The content of the L1 layer preparation stage of the data center includes interface clarification, resource preparation, program preparation and technical preparation, etc., the core is to identify the responsibility interface before construction, deliver resources and skills training.

Options:

A.

True

B.

False

Question 35

The DC RAinBow tool must initially determine whether a host can be migrated, and the information that must be confirmed includes: (Multiple choice)

Options:

A.

The bokeh platform type at the source

B.

The OS type of the host to be migrated

C.

The startup mode and disk format of the host to be migrated

D.

The underlying hardware model of the source-side virtualization platform

Question 36

Huawei Data Center L1 Integration Service quotation includes (multiple choice)

Options:

A.

Self-developed equipment implementation

B.

Purchased parts and services

C.

Project management services

D.

Risk money

Question 37

The main criterion of the data center design reference in the national standard Yes?

Options:

A.

GB50174-2008

B.

GB50462-2008

C.

GB50052-2009

D.

GB50352-2005

Question 38

Is Huawei Co-Care service a maintenance service solution jointly provided to customers by Huawei and more than a few CSPs?

Options:

A.

Certification level

B.

3

C.

4

D.

5

Question 39

What are the steps in the implementation process of HUAWEI CLOUD Evaluation Service Methodology? (Multiple choice)

Options:

A.

Assess readiness

B.

Application research

C.

Application analytics

D.

Evaluate the results

Page: 1 / 27
Total 265 questions