Summer Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: netdisc

Huawei H13-624_V5.5 HCIP-Storage V5.5 Exam Practice Test

Page: 1 / 11
Total 106 questions

HCIP-Storage V5.5 Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$43.75  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$38.5  $109.99
Question 1

An Industry customer purchases several Huawei flash storage devices for service deployment. During an inspection, an engineer finds that some storage components are faulty and need to be removed and replaced. Which of the following statements Is true about the part removal and replacement?

Options:

A.

The interface modules and system subracks of the storage device can be replaced independently.

B.

The CPUs of the storage device cannot be replaced independently, but can be removed independently.

C.

The memory modules and system disks of the storage device can be removed and replaced independently.

D.

The coin batteries of the storage device cannot be replaced or removed.

Question 2

Assume a financial customer purchased multiple Huawei OceanStor Dorado 18000 storage devices to carry service data. A Fibre Channel link exception occurred in the storage environment. Which of the following are possible causes for this exception?

Options:

A.

When a switch network is used, the configured rate of the Fibre Channel host port does not match that of the switch.

B.

The optical fiber is poorly connected or faulty.

C.

The optical module rate of host ports does not match that of front-end storage ports.

D.

The IP address of the service network port on the application server is incorrectly set.

Question 3

In Huawei container storage solution, CSI is short for Container Storage Interface. Which of the following statements is false about Huawei CSI?

Options:

A.

CSI Driver developed by Huawei is mainly used to implement the call initiated by sidecar on Huawei storage.

B.

Huawei storage and Huawei CSI driver need to communicate with each other through RESTful to provide NAS/SAN storage resources.

C.

CSI Controller runs independently on a worker node on the Pod in StatefulSet mode and is used to interact with the storage and create and delete resources on the storage side.

D.

CSI Node runs on each worker node of Kubernetes on the Pod in DaemonSet mode and can be used to mount and unmount related storage resources.

Question 4

Huawei OceanStor Pacific series is an intelligent scale-out storage product that supports large-scale scale-out and delivers high reliability. Which of the following statements are false about the product’s reliability?

Options:

A.

In terms of data reliability, multiple RAID policies are supported based on the traditional disk-level RAID mode.

B.

The product adopts Kunpeng processors to integrate functions of multiple chips and effectively improve hardware reliability.

C.

The product leverages link aggregation to ensure transmission link redundancy and performs link switchover or isolation to ensure service continuity if a link becomes faulty or subhealthy.

D.

The product uses the multi-copy technology to implement the intra-node RAID function. If a node is faulty, the system reliability is not degraded and even remains higher than that of the EC mechanism.

Question 5

An Industry customer has purchased several Huawei flash storage devices for service deployment. An engineer wants to configure the HyperReplication feature on the storage devices. During the configuration, the engineer needs to create an authentication user with the role of "Remote device administrator" on the remote device and then add the remote device.

Options:

A.

TRUE

B.

FALSE

Question 6

During routine inspection, engineers find that several faults occur on Huawei all-flash storage and need to rectify the faults. Which of the following is not a basic troubleshooting principle for storage systems?

Options:

A.

Analyze network alarms before NE alarms.

B.

Analyze general alarms before specific alarms.

C.

Analyze alarms of higher severities before those of lower severities.

D.

Analyze external factors before internal factors.

Question 7

In Huawei flash storage. If an engineer wants to remotely power on the storage system, the engineer must make an appropriate networking plan for the controller enclosures of the storage system. Which of the following statements is false about the networking principles of a storage system with multiple controller enclosures?

Options:

A.

All power cables have been connected properly to the controller enclosures.

B.

The maintenance network ports of all the controller enclosures have been connected correctly in accordance with standard networking.

C.

All scale-out cables have been connected property to the controller enclosures.

D.

The maintenance terminal has been connected to any service network port on any controller enclosure.

Question 8

For device reliability purposes, during the quick Installation of OceanStor Pacific 9550, engineers need to connect power cables on the storage device supplied by two power modules to separate power distribution units (PDUs).

Options:

A.

TRUE

B.

FALSE

Question 9

Similar to the alarm analysis method, the replacement method can be used to locate and rectify any type of faults for Huawei converged storage, and has no special requirement for maintenance personnel.

Options:

A.

TRUE

B.

FALSE

Question 10

The LUN active-active balancing feature of Huawei all flash storage Integrates the global load balancing.design. The front-end interface board evenly distributes I/Os to the target controller for load balancing.

Options:

Question 11

Which statements are false about software Installation of Huawei OceanStor Pacific series storage systems?

Options:

A.

To install the Distributed Parallel Client (DPC), the switch configuration is required before the installation regardless of whether the low level design (LLD)- or wizard-based installation mode is selected.

B.

To interconnect with FusionCompute during block service installation, storage and compute nodes must be deployed in converged mode, and the management nodes must be deployed in the virtualization environment.

C.

To interconnect with Huawei Cloud Stack during block service installation, storage and compute nodes must be deployed in converged mode, and the management nodes must be deployed in the virtualization environment.

D.

To install the file service in the standard protocol scenario, the switch configuration is not required throughout the entire installation process.

Question 12

When delivering a Huawei flash storage project, an engineer introduced the SAN/NAS Integrated architecture to the customer. Which of the following statements Is false about the architecture?

Options:

A.

The protocol layer is responsible for protocol parsing and permission management. SAN and NAS are two sets of semantic logic. Therefore, different service entry components are used.

B.

The space management layer uses the active-active high reliability mode to provide reliable data protection capabilities based on actual service scenarios of customers.

C.

The software architecture consists of the following layers from top to bottom: protocol, data service, cache, file and block space management, and storage pool.

D.

At the protocol layer, NFS/CIFS supports direct TCP offload engine (DT06), while ISCSI does not.

Question 13

Huawei Ocean Protect Appliance adopts the key technology of CPU core grouping and intelligent scheduling, which is widely used by customers in many industries. Which of the following is the advantage of this technology?

Options:

A.

The scheduler can distribute jobs to other cores based on the service load status, implementing load balancing.

B.

When this technology is used to carry different services, some cores are overloaded, resulting in high latency.

C.

This technology implements physical and logical isolation of resources, reducing latency.

D.

The system can prefetch data and metadata from all LUNs, improving the cache hit ratio.

Question 14

In a flash storage system, the ports of the cascading interface module or onboard cascading ports on the controller enclosure can only connect to port PI on the disk enclosure.

Options:

A.

TRUE

B.

FALSE

Question 15

To analyze disk performance, we can first use tools (such as free, top, vmstat, and pidstat) that support many indicators, and then determine the I/O source and analyze the file system and process I/Os.

Options:

A.

TRUE

B.

FALSE

Question 16

An Internet customer has deployed a remote replication environment based on multiple flash storage devices. During actual service running, the customer discovers that there are multiple running statuses for a remote replication pair. Which of the following statements is true about the running status of a pair?

Options:

A.

After a pair is disconnected, if the pair is deleted from the primary or secondary site, which causes configuration inconsistency between the primary and secondary sites, the pair running status changes to "To be recovered."

B.

When the pair running status is "Split," the pair relationship between the primary and secondary LUNs is interrupted (not manually).

C.

When the pair running status is "Normal," data synchronization between the primary and secondary LUNs is complete.

D.

When the pair running status is "To be synchronized," the pair relationship between the primary and secondary LUNs must be manually disconnected to meet the service requirements of a single LUN.

Question 17

An industry customer has purchased a Huawei OceanStor Pacific 9950 scale-out storage device for service deployment. During an inspection of the device, the location indicator of a main storage disk module is steady yellow. What is the status of the disk module?

Options:

A.

The main storage disk module is being located.

B.

The main storage disk module is running properly.

C.

The main storage disk module is powered off.

D.

The main storage disk module is faulty or about to fail.

Question 18

When demarcating a performance issue of Huawei flash storage, engineer A finds that the latency observed on the compute side is much longer than that on the storage side. This indicates that the issue most possibly occurred on the storage, for example, the disk performance upper limit has been reached.

Options:

A.

TRUE

B.

FALSE

Question 19

When delivering a flash storage project, Huawei engineers Introduced the SmartMuIti-Tenant feature of flash storage to the customer. Which of the following statements are true about SmartMulti Tenant?

Options:

A.

A super administrator can force itself, other super administrators, lightweight directory access protocol (LDAP) users, or LDAP user groups to change their passwords upon the next login.

B.

After a system is upgraded to support the SmartMulti-Tenant feature, all LUNs, file systems, and ports in the original system are allocated to the internal system vStore "System_vStore."

C.

To query system role information, the customer can run the "show role system" command.

D.

In flash storage, only a super administrator can modify vStore information, and the internal system vStore "System_vStore" cannot be modified.

Question 20

Assume a government customer purchased several Huawei scale-out storage devices for service deployment. An engineer needs to configure file services in standard protocol scenarios. Which of the following actions does not need to be performed by the engineer during the configuration?

Options:

A.

Install DPC.

B.

Create a converged storage pool.

C.

Create namespaces.

D.

Enable the file service for nodes.

Question 21

A financial customer has purchased several Huawei OceanStor Dorado series storage devices for mission-critical service deployment. SmartMigration is configured to migrate services from a source LUN to a target LUN without interrupting host services. Which of the following statements about this feature is false?

Options:

A.

The implementation of a SmartMigration task between heterogeneous storage systems depends on the LUN takeover function provided by SmartVirtualization.

B.

When configuring this feature, you must plan the capacities of the source and target LUNs. The capacity of the target LUN must be greater than or equal to that of the source LUN.

C.

When configuring this feature, you cannot use a LUN that has been mapped to an application server as the target LUN of a SmartMigration task.

D.

The higher the migration rate, the better the host service performance is. Therefore, the highest migration rate can be used when the host service load is heavy.

Question 22

To power off a storage system, you need to stop host services, power off controller enclosures, and then disconnect external power supplies.

Options:

A.

TRUE

B.

FALSE

Question 23

Assume an industry customer purchased several Huawei flash storage devices for service deployment. During routine management, an engineer found that the host bus adapter (HBA) driver version of the host is outdated and the number of concurrent HBAs was insufficient. As a result, the latency on the host differs greatly from that on the storage side. Which of the following measures can the engineer take to optimize performance?

Options:

A.

Use the management software provided by the HBA vendor to query and modify the number of concurrent HBAs.

B.

Upgrade the HBA driver to the latest version.

C.

Change the load balancing algorithm of the multipathing software to min-task.

D.

Change the cache prefetch policy to constant prefetch.

Question 24

Huawei flash storage supports_____. That is, the existing storage system can be used to meet customers' Increasing requirements by continuously adding storage components.

Options:

Question 25

Assume a bank customer purchased several Huawei flash storage devices for deploying the document Imaging service. This service mainly involves random large I/Os, more read operations than write operations, and many metadata operations, with obvious hot and cold data characteristics.

Options:

A.

TRUE

B.

FALSE

Question 26

Assume an Industry customer purchased a Huawel flash storage device for service deployment. After a fault occurs, an engineer needs to use the CLI to view bit error Information of front end host ports for troubleshooting. Which of the following commands cannot be used for this purpose?

Options:

A.

show coexist-forward-switch

B.

show controller io io_type=frontEnd controller_id=XX

C.

show port biLerror

D.

show host-port error

Question 27

A financial customer has purchased several Huawei OceanStor Pacific 9550 storage systems. When configuring basic object services on the storage systems, an engineer discovers that the object service cannot be enabled for storage nodes. Which of the following is not a possible cause?

Options:

A.

The engineer has manually adjusted the time of the cluster nodes. As a result, the conflict handling is different.

B.

NTP synchronization is not configured for the cluster, and different NTP time sources are used.

C.

Namespaces with the same name have been created under the same account.

D.

The Network Time Protocol (NTP) clock in the storage cluster is inconsistent with the clock of the client that accesses object services.

Question 28

In Huawei backup storage OceanProtect X3000, data reduction supports fixed-length (^duplication by default, but does not support variable-length (^duplication. Therefore, fixed-length ded11plication Is mainly used in the backup field.

Options:

A.

TRUE

B.

FALSE

Question 29

A school has purchased two Huawei OceanStor Pacific series storage devices for service deployment. An engineer wants to configure the distributed parallel client (DPC) on the storage devices. Which of the following statements is false about the engineer's configuration?

Options:

A.

If upper-layer services require high data security, the engineer needs to set the storage pool type to "Self-encrypting" when creating a converged storage pool.

B.

Before creating a converged storage pool, the engineer must enable the file service for nodes on DeviceManager.

C.

When creating a namespace, the engineer needs to select a security style and application type.

D.

When the storage network is a Remote Direct Memory Access over Converged Ethernet (RoCE) network, the engineer can run the "systemctl stop lldpad.service" command to disable the lldpad service.

Question 30

Assume a financial customer purchases a Huawei OceanStor Pacific scale-out storage system for future service deployment. Which statement is false about software installation of the storage system?

Options:

A.

During block service installation, if management nodes are deployed where compute and storage nodes are converged, the number of vCPUs on each converged compute and storage node must be greater than or equal to 20.

B.

During block service installation, if converged deployment of storage and compute nodes is required, the difference between the disk quantities on any two nodes in the same storage pool cannot be greater than 2 or 30% of the disk quantity on the node having most disks.

C.

If wizard-based software installation is used, an engineer must manually add nodes, configure networks, and create a control cluster on DeviceManager, and then install the OceanStor Pacific series software.

D.

To install the Distributed Parallel Client (DPC), the memory required for running the DPC software on a compute node must be greater than or equal to 20 GB.

Question 31

When the HyperReplication feature of Huawei scale-out storage is applied, If the properties of a consistency group are modified, the property modification will be synchronized to each pair in the consistency group. That is, the properties of the consistency group prevail.

Options:

A.

TRUE

B.

FALSE

Page: 1 / 11
Total 106 questions