Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

HP HPE0-S60 Delta - HPE Compute Solutions Exam Practice Test

Page: 1 / 8
Total 79 questions

Delta - HPE Compute Solutions Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.

Options:

Question 2

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

Options:

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Question 3

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Options:

A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Question 4

An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.

Click the parameter that the customer should configure within an uplink set to meet this requirement

Options:

Question 5

In the past a customer experienced a networking issue where network ports went down and came back up in quick succession.

Which HPE Virtual Connect SE 100 GD F32 Module for HPE Synergy feature can be configured to disable such ports?

Options:

A.

Pause flood protection

B.

sFlow

C.

Storm control

D.

Port flap protection

Question 6

Which statement about a new HPE SimpliVity deployment is true?

Options:

A.

New HPE SimpliVity deployments gives customer flexible choice of hypervisor

B.

A new HPE SimpliVity node can be a member of multiple dusters

C.

AM new HPE SimpliVity models are software optimized

D.

All new HPE SimpliVity models are based on mid CPUs

Question 7

Which statement about the SY480 Gen10 Plus Compute Module is true?

Options:

A.

It cannot be mixed with Gen9 compute modules in the same frame.

B.

It supports 8 memory channels and memory DIMMs of up to 256GB.

C.

It only supports NVDIMM Persistent Memory.

D.

It supports "3rd Gen AMO EPYC Server Processors with 64 cores.

Question 8

Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.

Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.

Options:

Question 9

Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?

Options:

A.

Rack Management Controller for nPar management

B.

HPE Superdome Flex Grid licenses enabling connectivity between chassis

C.

At least Tour HPE Persistent Memory DIMMs per nPar

D.

One base chassis and three expansion chassis with licenses

Question 10

Refer to the exhibit.

Which statement about this logical interconnect group is true?

Options:

A.

Both modules are located in different frames for redundancy

B.

For an uplink set, ports from different modules can be selected

C.

interconnect modules are installed in interconnect bays 1 and 4

D.

An additional license is required to change the enclosure count

Question 11

Match each HPE Synergy logical component with the definition.

Options:

Page: 1 / 8
Total 79 questions