Question 1

Customers of the data center want to know how much of the data center's power comes from renewable sources.

What should the data center service provider do to respond to these requests?

Options:

A.

Request the power company to provide an estimate

B.

Inform the customer that it is not possible to exactly determine how the power is generated

C.

Ignore the request since the source of power generation is not part of the SLA

D.

Implement the Renewable Energy Factor (REF) and report accordingly

Question 2

The data center is conducting a needs analysis.

Which of the below is an activity of the needs analysis?

Options:

A.

Identifying the operating hours for the service

B.

Identifying the current usage for power and cooling

C.

Identifying the required headcount to operate the service

D.

Identifying monitoring requirements

Question 3

Which, of the items below, is not part of operational cost (OPEX)?

Options:

A.

Cost of staffing

B.

Replacing the fans and belts of an air-conditioner

C.

Acquisition of real estate

D.

Annual software license fees

Question 4

Out of the below, which one is not part of the needs analysis?

Options:

A.

Business requirements

B.

Physical infrastructure requirements

C.

Commercial requirements

D.

Legal requirements

Question 5

What is the formula to calculate the PUE of a Data Center?

Options:

A.

PUE = UPS input power / UPS output power

B.

PUE = VA * PF

C.

PUE = Total facility power / Total IT equipment power

D.

PUE = Total generator capacity / total battery capacity

Question 6

The data center organization conducted a customer satisfaction survey and concluded that a very low number of customers participated.

What is the most likely cause?

Options:

A.

The survey did not have enough questions

B.

The survey was not sent on behalf of the data center manager

C.

The survey had too many questions

D.

The survey was sent by postal mail instead of e-mail

Question 7

The data center organization has all its services prepared and wishes to announce the outcome to its customers so that they can place their order.

What document – or information – will it share?

Options:

A.

Service portfolio

B.

Business continuity plan

C.

Needs analysis report

D.

Service catalog

Question 8

Management wants to receive a monthly report on data center cost breakdown per business unit without transferring the actual cost to the users.

Which model should you apply?

Options:

A.

Chargeback

B.

Show back

C.

Setback

D.

Pay back

Question 9

The organization is preparing for business continuity.

Due to the current economic situation, management wants to spend as little money as possible on an alternative facility.

Which option should you propose?

Options:

A.

Co-location

B.

Company owned

C.

Government owned

D.

DR provider

Question 10

The needs analysis has been completed and the data center organization is tasked with the capability assessment.

Which of the below is a mandatory activity as part of the capability assessment?

Options:

A.

Review the security needs

B.

Create inventory of skills, knowledge and capacity

C.

Determine the availability requirements

D.

Identify applicable safety requirements

Question 11

During lock-out/tag-out, which of the below is the most recommended procedure?

Options:

A.

Operator locking out the equipment and another operator removing the lock-out

B.

Operator locking out the equipment and the safety manager removing the lock-out

C.

Operator locking out the equipment and the facilities manager removing the lock-out

D.

Operator locking out the equipment and the same operator removing the lock-out

Question 12

What is equipment life cycle management?

Options:

A.

The process to determine what the technical lifetime of the equipment is

B.

Equipment life cycle management is only used as input for the budgeting process in financial management

C.

The process to determine what the economic lifetime of the equipment is

D.

The process to ensure that all the physical facilities and supporting equipment is fit for their intended purpose on a continuous basis

Question 13

A recent cooling equipment failure resulted in a sudden shutdown of IT systems. Although the service provider was quickly on-site, it eventually took more than 12 hours for the cooling equipment to be repaired. Management wants to prevent this from happening again.

What is the best response?

Options:

A.

Upgrade to a Time & Material contract

B.

Upgrade to a basic contract

C.

Upgrade to a comprehensive contract

D.

Upgrade to an exclusive contract

Question 14

Training programs need to be selected.

Of the below, which is the first activity to start with?

Options:

A.

Create inventory of the services in the service catalog

B.

Contact training providers requesting for brochures

C.

Review the skills matrix

D.

Compare prices of various training programs

Question 15

Of the below, which is a power efficiency indicator?

Options:

A.

nil, w

B.

PUE

C.

CPU

D.

uw

Question 16

Which process is not part of the 6-step document management life cycle?

Options:

A.

Creation

B.

Publication

C.

Provisioning

D.

Destruction

Question 17

When is the right moment to label assets?

Options:

A.

The moment support and maintenance contracts apply

B.

The moment of unpacking the equipment

C.

The moment of testing the equipment

D.

The moment of commissioning the equipment for production

Question 18

Of the below, which can be used to optimize succession planning?

Options:

A.

Career development program

B.

Disciplinary program

C.

Relationship with manager

D.

External recruitment