Question 1

What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

Options:

A.

Latency and bandwidth measurement to the witness host

B.

Network configuration and performance for vSAN

C.

Network performance for virtual machines

D.

Latency measurement between DCs for Stretched Clusters

Question 2

A VxRail cluster is being deployed in a DMZ environment. What is the recommended deployment option?

Options:

A.

External vCenter Server with customer-supplied VDS

B.

External vCenter Server with VxRail-deployed VDS

C.

Internal vCenter Server with internal DNS

D.

Internal vCenter Server with external DNS

Question 3

What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

Options:

A.

External vCenter server must be upgraded after the VxRail is upgraded

B.

vCenter Server requires a temporary IP address on a different subnet before the upgrade

C.

Secure boot must be enabled on the ESXi hosts for a successful upgrade

D.

VxRail Manager VM must be changed to the default name to avoid an upgrade failure

Question 4

Match each VxRail API request with the information to be retrieved.

Options:

Question 5

An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches. Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?

Options:

A.

show network-policy profile

B.

show interface status

C.

show port-channel summary

D.

show interface

Question 6

According to Dell best practices, which VxRail series can be deployed in either datacenters or remote locations?

Options:

A.

D Series

B.

V Series

C.

G Series

D.

E Series

Question 7

Which vSAN feature requires an All-Flash cluster?

Options:

A.

Deduplication and compression

B.

Data-at-Rest Encryption

C.

Data-in-Transit Encryption

D.

Storage Policy Based Management

Question 8

What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-6 (Erasure Coding)?

Options:

A.

4

B.

5

C.

6

D.

7

Question 9

Which two files are used to automate VxRail deployment and validate the network configuration?

Options:

A.

Appliance JSON file

PEQ data file

B.

VxRail Configuration Portal

PEQ data file

C.

VxRail Test Plan

SPEQ

D.

Appliance JSON file

SPEQ

Question 10

What is a benefit of using the VxRail REST API?

Options:

A.

Remote upgrades of iDRAC related software only

B.

Automated security audit of VxRail clusters

C.

Automated log collection for VxRail clusters

D.

Polling for vSAN performance statistics

Question 11

Match each IDRAC Maintenance page tab to its description.

Options:

Question 12

What is the maximum number of supported nodes for a VxRail cluster running on a 1 GbE network?

Options:

A.

4

B.

5

C.

16

D.

32

Question 13

What setting is used for the object space reservation in the VXRAIL-SYSTEM-STORAGE-PROFILE?

Options:

A.

50% Reservation

B.

Thick Provisioning

C.

75% Reservation

D.

Thin Provisioning

Question 14

From what location should NVT for VxRail be run?

Options:

A.

Jump server on a different network

B.

Workstation on the same network as VxRail Manager

C.

VxRail network Top of Rack switch

D.

Laptop connected to the first VxRail ESXi node

Question 15

Match each VxRail, data protection solution with its functionality.

Options:

Question 16

What is a requirement for the vSAN Data-at-Rest Encryption?

Options:

A.

All-Flash or AII-NVMe VxRail

B.

VxRail with at least 3 nodes

C.

External Key Management Server

D.

External customer provided vCenter

Question 17

An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?

Options:

A.

5

B.

10

C.

20

D.

25

Question 18

What is a valid 2-node VxRail cluster configuration?

Options:

A.

Series with 4x 25 GbE in a direct-connect configuration

B.

Series with 4x 10 GbE in a switch configuration

C.

Series with 4x 1 GbE in a direct-connect configuration

D.

Series with 2x 25 GbE in a switch configuration

Question 19

A company has recently implemented a popular date center monitoring and reporting software solution. They plan to use the solution to consolidate reporting into a single platform.

What is an expected benefit of programmatically gathering VxRail information?

Options:

A.

Perform node shutdowns and specific operations

B.

Perform pre-checks for vSAN health

C.

Automate iDRAC firmware management and status

D.

Obtain status of all running operations on a cluster

Question 20

An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?

Options:

A.

Extensive maintenance

B.

Temporary maintenance

C.

Permanent removal of host from cluster

D.

Shutdown of an entire cluster

Question 21

Use the VxRail simulator to explore the system. What is the presented configuration?

Note: It fs necessary to close (x) the simulator window before you can select a response to this question.

Options:

A.

Internal vCenter and external DNS

B.

Internal vCenter and Internal DNS

C.

External vCenter and external DNS

D.

External vCenter and internal DNS

Question 22

A systems engineer needs to check the health of the nodes and the system VMs to prevent complications or failures during VxRail upgrades. Which tool must be used to perform the task?

Options:

A.

VxVerify

B.

CloudlQ

C.

SolVe Online

D.

VxRail ACE

Question 23

A VxRail Manager VM must be configured as follows:

* IP address: 192 168.10.16

* Net mask: 255.255.255.0

* Gateway: 192 168 10 254

Which command must be used?

Options:

A.

vxrail-network-config --ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254

B.

vxrail-prrmary -config --ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254

C.

vxrail-primary -config --vxrail-address 192.168.10 16 --vxrail-netmask 255 255 255 0 -vxrail-gateway 192.168,10 254

D.

vxrail-network -config --vxrail-address 192.166 10 16 --vxrail-netmask 255 255.255 0 --vxrail-gateway 192.168.10.254

Question 24

An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.

What procedure would result in the quickest node addition?

Options:

A.

RASR Factory Image Upgrade

B.

Factory Reset

C.

VxRail Node Imaging Management

D.

Compute node expansion

Question 25

Which command is used to restart the Loudmouth process on an ESXi node?

Options:

A.

/usr/IibAmiware/loudmouth/bin/loudmouthd restart

B.

systemcti restart loudmouth

C.

/etc/int.d/loudmouth restart

D.

systemcti restart vmware-loudmouth

Question 26

What is a consideration when implementing a custom VDS on a VxRail cluster?

Options:

A.

Used by multiple clusters managed by a single vCenter instance

B.

Supported with external and internal vCenter Servers

C.

Supports only four NIC uplinks

D.

Supports only two NIC uplinks

Question 27

What is a valid 2-node VxRail cluster configuration?

Options:

A.

2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter

B.

2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter

C.

2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter

D.

2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter

Question 28

For which VxRail models must the iDRAC NIC Selection be set to Dedicated?

Options:

A.

D, G, P, S, and V Series

B.

E, P, S, and V Series only

C.

D, E, P, S, and V Series

D.

D, E, and G Series

Question 29

What is the maximum number of supported nodes in a VxRail Stretch Cluster?

Options:

A.

16

B.

30

C.

32

D.

64

Question 30

The VxRail Deployment Wizard is being used on a VxRail cluster with a customer-supplied VDS. Which settings must be used to ensure successful installation?

Options:

A.

Use the VxRail vCenter Server

Upload a configuration file (JSON)

B.

Join an external vCenter Server

Use the step-by-step method

C.

Use the VxRail vCenter Server

Use the step-by-step method

D.

Join an external vCenter Server

Upload a configuration file (JSON)

Page: 1 / 10