Question 1

What is the MAIN benefit of carrying out regular software updates provided by the device manufacturer?

Options:

A.

increasing the bandwidth

B.

providing a higher data throughput

C.

enhancing the data security of the system

D.

providing a better understanding of the system

Question 2

When is the optimal time to conduct training of end users in a new AV installation?

Options:

A.

after all participants have reviewed equipment manuals

B.

when all users of the facility can be trained at the same time

C.

at the time of system handover with accompanying user guides

D.

during installation so that the system can be configured and modified in line with the user's knowledge

Question 3

Which of the following is an example of PPE?

Options:

A.

fiberglass ladder

B.

high visibility vest

C.

virtual reality headset

D.

company branded polo

Question 4

In a basic AV rack, what is the most effective method to promote proper airflow?

Options:

A.

Close unused rack spaces with blanking panels

B.

Install fans at the front and rear of the rack

C.

Leave extra space between all rack-mounted units

D.

Remove all rear rack panels for passive exhaust

Question 5

Noting the position of ventilation ducts is useful when determining

Options:

A.

the best position for the lectern.

B.

the heat gain of the equipment rack.

C.

where a projector can be suspended.

D.

where people can be seated in the room.

Question 6

What device should be used to send a single video signal to several monitors?

Options:

A.

Matrix mixer

B.

Passive switcher

C.

Frame synchronizer

D.

Distribution amplifier

Question 7

A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh. What is the PRIMARY concern?

Options:

A.

cable color

B.

cable labeling

C.

cable condition

D.

cable connection

Question 8

An AV technician has been called to a lecture hall where the presenter complains of a loud squealing noise that makes their presentation inaudible. What is the BEST strategy to address the complaint?

Options:

A.

Increase the gain for the microphone

B.

Position the microphone away from the presenter

C.

Position the microphone in front of the loudspeakers

D.

Mute unused microphone channels on the audio mixer

Question 9

Which of the following is the correct group of signal cables that can be cabled within one side of a rack while considering the signal separation in order to avoid electromagnetic interference?

Options:

A.

RF, loudspeaker, line level audio

B.

Loudspeaker, microphone, video

C.

Microphone, line level audio, relay control

D.

Microphone, line level audio, digital control

Question 10

Which area of this building is likely to have more stringent regulations for cable insulation materials than any other area?

Select the answer by clicking on the correct area within the section view.

Options:

Question 11

During project delivery and after completion, it is important to ensure correct management of control system code so that

Options:

A.

programming costs will be within project budget.

B.

other contractors are unable to reuse or edit code.

C.

the most up-to-date version of code is available for upload when required.

D.

sub-contract programmers submit uncompiled code as per their contract of employment.

Question 12

What section of the color chart is used to calibrate brightness? Select the answer by clicking on the appropriate area of the chart

Options:

Question 13

While replacing a lamp in a client's LCD projector, it is important to:

Options:

A.

Clean the air filter and reset the lamp timer.

B.

Calculate the new projector throw distance.

C.

Test the projector using a commercially produced DVD movie.

D.

Measure the projector's light output with the new lamp in place.

Question 14

During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done?

Options:

A.

consult the projector's manual

B.

replace the projector's lamp and filters

C.

disregard because the projector is operational

D.

remove the power cable and re-boot the projector

Question 15

To help end users remember key points of the training, the training documentation should include

Options:

A.

equipment datasheets.

B.

a customized quick start guide.

C.

user manuals for each piece of equipment.

D.

instructions for maintaining system input devices.

Question 16

One way to safeguard individual pieces of equipment in a rack from theft is the use of

Options:

A.

lacing bars.

B.

a rack shelf.

C.

security screws.

D.

a password.

Question 17

The AV Project Manager is responsible for

Options:

A.

schedule, budget, scope.

B.

design, schedule, configuration.

C.

budget, installation, maintenance.

D.

configuration, scope, maintenance.

Question 18

When a presenter is using a headworn wireless microphone, the sound technician notices a great deal of plosives and breath noise. To correct this problem, the technician should:

Options:

A.

Ask the speaker to talk more quietly

B.

Adjust the microphone wireless transmitter gain

C.

Change from an omnidirectional to a cardioid capsule

D.

Adjust the position of the microphone and use a windscreen

Question 19

Image:

Based on this diagram, how many lighting zones are there?

Options:

A.

3

B.

4

C.

5

D.

6

Question 20

There are a number of ways to attach a projector mount to a concrete ceiling. What is tire PRIMARY factor that must be considered when deciding which, if any, method is appropriate?

Options:

A.

the age of the concrete

B.

the condition of the concrete

C.

the tools that are available

D.

the space between the drop ceiling and the concrete

Question 21

Before confirming an anticipated completion date with the customer, it is MOST important to

Options:

A.

double check the floor finishes.

B.

ensure the date is not a holiday.

C.

ensure no components are backordered.

D.

create the system maintenance schedule.

Question 22

Which of these cables should be used for a balanced microphone signal?

Options:

A.

A

B.

B

C.

C

D.

D

Question 23

When addressing system functionality with a client, an integrator should:

Options:

A.

Discuss future technologies

B.

Ignore currently installed systems

C.

Suggest sustainable building guidelines

D.

Assess specific requirements and expectations

Question 24

A remote monitoring system's PRIMARY benefit is that it

Options:

A.

reduces the need for service calls.

B.

does not need to be located in the same building.

C.

provides a faster response time for problem solving.

D.

allows the AV team to make sure the equipment is being used properly.

Question 25

The purpose of the system performance verification process is to:

Options:

A.

Conclude the installation phase and close out the project.

B.

Allow the AV contractor to send the final invoice for the project.

C.

Ensure the AV system meets substantial completion requirements.

D.

Provide a means for the AV contractor to objectively demonstrate the AV system meets performance criteria.

Question 26

A task cannot begin before another task is completed. How is this described in a project task schedule?

Options:

A.

requirement

B.

dependency

C.

consequence

D.

determination

Question 27

What should an AV integrator provide to a general contractor to ensure the supporting trades get the AV information that is needed?

Options:

A.

bid drawings

B.

permit drawings

C.

as-built drawings

D.

construction drawings

Question 28

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

Options:

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.

Question 29

Which of the following is an EQ type?

Options:

A.

gate

B.

limiter

C.

parametric

D.

compressor

Question 30

A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

Options:

A.

288 In (7303 mm)

B.

302 in (7681 mm)

C.

331 in (8413 mm)

D.

446 in (11339 mm)

Question 31

During an initial meeting with a prospective client regarding an audiovisual project, it is important to understand the customer's method of procurement in order to avoid.

Options:

A.

making commitments with regard to delivery times for equipment.

B.

designing the system beyond the budgetary constraints of the client.

C.

missing some of the important components that will be included in the final project.

D.

expending time and resources designing a project that may ultimately go to bid (tender).

Question 32

Projectors utilizing laser phosphor technology might be favored for installation in inaccessible locations because:

Options:

A.

They are cheaper and easier to install.

B.

They require little maintenance and they generate less heat.

C.

They fit in a smaller lighter package compared to lamped units.

D.

The light source is linear so less affected by ambient conditions.

Question 33

This image shows the workings of which type of microphone?

Options:

A.

ribbon

B.

dynamic

Question 34

Constant voltage distributed audio systems utilize a_____wiring scheme.

Options:

A.

star

B.

loop

C.

series

D.

parallel

Question 35

On a construction project awarded through a competitive process, the electrical contractor says that the AV company is responsible for the installation of conduit. What project document(s) would determine responsibility?

Options:

A.

estimate

B.

submittals

C.

proposal cover letter

D.

bid (tender) documents

Question 36

Your client has requested a 50inch monitor be mounted on the south wail of this boardroom. Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

Options:

A.

A

B.

B.

C.

C

D.

D

Question 37

Which method of control is supported by HDBaseT?

Options:

A.

PCIE

B.

DAU

C.

RS-232

D.

DMX512

Question 38

When an audio device can no longer accurately reproduce the audio signal, It is called

Options:

A.

feedback.

B.

dithering.

C.

distortion.

D.

saturation.

Question 39

A client wants a third-party commitment that a project will be completed as per contract and protection against losses if it is not. What document should they request from their supplier?

Options:

A.

liability policy

B.

performance bond (guarantee)

C.

statement of qualification

D.

quality assurance checklist

Question 40

When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

Options:

A.

obtain the costs

B.

create the submittal

C.

schedule a site visit

D.

read the project description

Question 41

The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

Options:

A.

customers contact details.

B.

current resale value of assets.

C.

current state and commitments of assets.

D.

customer’s budgets and spending history.

Question 42

Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

Options:

A.

request for quote

B.

request for proposal

C.

contract documents

D.

bid packet (response)

Question 43

Maintaining AV operations includes which of the following?

Options:

A.

conforming to DISCAS

B.

measuring system SPL

C.

updating control system firmware

D.

comparing NAG and PAG calculations

Question 44

Which requirement supersedes others when planning an AV project for a client?

Options:

A.

Institutional policies

B.

Existing infrastructure

C.

Organizational standards

D.

Local safety ordinances and building codes

Question 45

Owner standards and design manuals are examples of which kind of documentation?

Options:

A.

vendor

B.

technical

C.

architectural

D.

existing conditions

Question 46

The limits of the vertical visual field indicate that displays should be positioned where in relation to the viewers' standard line of sight?

Options:

A.

center of the image is precisely on-axis

B.

center of the image is at least 10 degrees above

C.

top of the image is no more than 30 degrees above

D.

bottom of the image is no more than 30 degrees below

Question 47

Ambient noise PRIMARILY affects desired sound by

Options:

A.

enhancing it.

B.

canceling it out.

C.

interfering with it.

D.

complementing it.

Question 48

Which of the following project management activities coordinates project requirements and resources?

Options:

A.

project budget

B.

logic model timeline

C.

logic network diagram

D.

project kick-off meeting

Question 49

Which connector is typically used for ease of termination for various signal types?

Options:

A.

B.

Question 50

System performance verification occurs when the system is

Options:

A.

in need of repair.

B.

completely installed.

C.

removed from service.

D.

approved by the customer.

Question 51

When running audio in an enclosed booth, what feature is MOST important for the studio monitors used by the sound engineer?

Options:

A.

Dolby Digital 5.1 surround sound

B.

A subwoofer with a bass boost feature

C.

Flat frequency response across the entire audio spectrum

D.

Digital signal processing including acoustic echo cancellation

Question 52

Two computers are connected to a videoconferencing system through a switcher using HDMI cables. Computer content from PC A is being properly transmitted. However, when PC B is selected by the switcher, it does not work through the videoconferencing system. They both work when connected directly to the videoconferencing system or the monitor. The solution is to add a device that enables____management.

Options:

A.

DDC

B.

DHCP

C.

HDCP

D.

TMDS

Question 53

A client wants to upgrade tire AV system in a boardroom and add control of the lights and shades to the control panel. What information is MOST relevant to gather to enable this integration?

Options:

A.

color temperature

B.

number of IR ports

C.

warranty Information

D.

communications protocols

Question 54

Every item in a room has some acoustic absorption or reflection characteristics. The level of sound absorbed is MOST affected by

Options:

A.

distance from the sound source.

B.

ambient sound in the system location.

C.

relative loudness of the source material.

D.

frequency and direction of the source.

Question 55

A typical speech reinforcement system which is broken down into zones, with each zone corresponding to its own set of microphones, power amplifiers, and loudspeakers is known as:

Options:

A.

Mix-minus

B.

Public address

C.

Audio conferencing

D.

Interruptible feedback

Question 56

As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.

Options:

A.

installer

B.

customer

C.

employer

D.

consultant

Question 57

Reverberant sound reaches the listener's ears

Options:

A.

after

B.

before

C.

synchronized with

D at the same level as the direct sound.

Question 58

When gathering information, it is important to ask about the customer's goals because the

Options:

A.

customer may have unrealistic expectations of what can be done.

B.

customer may be planning on moving before the project is complete.

C.

integrator needs to confirm they understand the relationship between desires and budget

D.

integrator needs an understanding of what the customer expects to beable to do with the space.

Question 59

The video conferencing suite shown has a large conference table centered in the room. Dimming which of the COLORED zones would tend to decrease facial shadows? Select the answer by clicking on any light fixture within a zone.

Options:

Question 60

A client wants to install new ceiling microphones to an existing system. Which trade does the technician need to coordinate with for the microphone placement?

Options:

A.

HVAC

B.

Painting

C.

Plumbing

D.

Interior design

Question 61

Signal flow on a schematic is conventionally shown in which direction?

Options:

A.

Left to right

B.

Right to left

C.

Top to bottom

D.

Bottom to top

Question 62

A 2x2 video wall was sold with each display being Full HD resolution. Now the client wants to show live content at the best possible quality over the complete wall. Which resolution must the camera provide?

Options:

A.

1920 x 1080

B.

3840 x 2160

C.

4096 x 2160

D.

7680 x 4320

Question 63

After there is an approved labor change to a project, what should the project manager do NEXT?

Options:

A.

update the schedule

B.

order the equipment

C.

issue an invoice for the change

D.

inform the purchasing department

Question 64

Which agreement typically includes installation materials and workmanship against failure for a stipulated period after the installation is complete?

Options:

A.

Service warranty

B.

System warranty

C.

Preventive warranty

D.

Manufacturer's warranty

Question 65

According to AVIXA's Projected Image System Contrast Ratio standard, what is the minimum contrast ratio for a projected image?

Options:

A.

1:1

B.

5:1

C.

10:1

D.

15:1

Question 66

The circuit on the RIGHT is an electrical drawing of what type of speaker system?

Options:

A.

series circuit

B.

constant voltage

C.

stereo pair circuit

D.

combination parallel/series circuit

Question 67

Which is the MOST important factor during the development of an AV project scope?

Options:

A.

entire budget

B.

clients responsibility

C.

analyze the strategic plan

D.

stakeholders requirements

Question 68

According to the AVIXA Rack Design standard, what should be the MINIMUM distance between an AC Power cable and a Data Twisted Pair cable?

Options:

A.

25 mm (~1 in)

B.

50 mm (-2 in)

C.

100 mm (~4 in)

D.

300 mm (~12 in)

Question 69

Based on this image, what is the aspect ratio for WUXGA?

Options:

A.

1.6:1

B.

1.78:1

C.

1.85:1

D.

2.35:1

Question 70

When choosing an amplifier for a 70 V system, what amplifier output would be the BEST option for a space with 12 speakers, each tapped to 30 W?

Options:

A.

1 channel, 500 W at 70 V

B.

2 channel, 200 W at 70 V

C.

12 channel, 30 W at 70 V

D.

12 channel, 30 W at 8 Ω

Question 71

A change order (variation) is best defined as a:

Options:

A.

Change to the technician’s salary

B.

Price change to a vendor purchase order

C.

Drawing change to document CAD details

D.

Change to the scope of an awarded project

Question 72

A schedule is being created for a project. Which of these factors will have the MOST impact on the calculations?

Options:

A.

labor hours

B.

inventory

C.

blueprints

D.

cost of materials

Question 73

What should be used to clean foam microphone wind screens?

Options:

A.

bleach (lye)

B.

warm water

C.

ethyl alcohol

D.

isopropyl alcohol

Question 74

Which setting on the digital multimeter should be used to determine if a DC power supply has failed?

Select the correct measurement category by clicking anywhere within the measurement range.

Options:

Question 75

One MAIN benefit of multicast over unicast in a network AV solution is it

Options:

A.

supports multi-channel audio.

B.

supports higher video resolutions.

C.

reduces network bandwidth whenusing multipleencoders.

D.

reduces network bandwidth whenusing multipledecoders.

Question 76

When should preventive maintenance be undertaken?

Options:

A.

when a projector lamp has failed

B.

after a customer has reported a system failure

C.

when there is more than one failure in the system

D.

at scheduled times independent of system failures